PlannedNearby

Monmouth County · Keyport Borough · #1322-04-0001.7

Two-story maintenance and office building

357 West Front Street, Keyport Borough, NJ · 5,500 sq ft non-residential, office

In short: Two-story maintenance and office building is an office development at 357 West Front Street in Keyport Borough, Monmouth County, NJ. It would add 5,500 sq ft of non-residential space. Its estimated construction value is about $1.6M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: The county record lists the state waterfront development permit as approved on 2026-04-21. No source found shows later permits or construction. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved The county record lists the state waterfront development permit as approved on 2026-04-21. No source found shows later permits or construction. · web research checked Nov 21, 2026 · source AI research
  1. Proposed
  2. In reviewDec 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Three existing buildings at 357 West Front Street in Keyport Borough will be removed and replaced with one two-story, 5,500-square-foot maintenance and office building, with partial reconfiguration of the boat racks.

Official description: Removal of three existing buildings and construction of one two-story, 5,500 square foot maintenance and office building, with partial reconfiguration of the boat racks.

Plan type
State environmental permit application (NJDEP)
Land use
Office
Status
approved

Project history

  • 2026-04-21 · #1322-04-0001.7 · State environmental permit application (NJDEP) · 5,500 sq ft
  • 2026-04-21 · NJDEP waterfront development permit 1322-04-0001.7: approved · source
  • 2025-12-03 · NJDEP waterfront development permit 1322-04-0001.7: 30-day public comment period · source
  • 2024-12-19 · NJDEP waterfront development permit 1322-04-0001.7: application filed · source

County plan review office →

The full picture AI research · Nov 21, 2026

The marina at 357 West Front Street in Keyport would replace three existing buildings with one two-story building of about 5,500 square feet. The building would hold maintenance space and offices. Part of the boat-rack layout would also be reconfigured.

The site is a working waterfront marina. Business listings show Brown's Point Marina there, offering rack storage, repairs and slips. Borough planning board minutes from 2021 show a site plan for the wider marina property. That plan moved boats off the ground and onto racks. It is not clear whether the new building is part of that plan.

The state environmental agency approved a waterfront development permit for the project on 2026-04-21. No news coverage, borough hearing record or construction notice was found for this specific building.

What it could mean nearby

Where it stands

The state environmental agency approved the waterfront development permit on 2026-04-21, after a public comment period that opened in December 2025. The records found do not show whether building permits have been issued or work has started.

Who's behind it

357 West Front Street, L.L.C. · A business directory lists this company as a marina operator at the address, and parcel records show it as an owner of nearby land. The marina operates as Brown's Point Marina.

Around the web

Planning terms explained
Waterfront development permit
A state environmental permit required for building at or near tidal waters.
Public comment period
A set time when residents can send written comments to the agency before it decides.
Site plan
A detailed drawing, reviewed by the local planning board, of buildings, parking and access on a property.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The state environmental agency issued the permit, and its comment period has closed. Any borough approvals would go through Keyport's planning board, whose meetings are open to the public.

In New Jersey, the Keyport Borough planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Keyport Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $1.6M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →