[Monmouth County](https://plannednearby.com/c/monmouth-nj/) · [Long Branch City](https://plannednearby.com/c/monmouth-nj/long-branch-city) · #1325-25-0002.1

# Multifamily building with ground-floor retail

305 Broadway, Long Branch City, NJ · mixed use

In short: **Multifamily building with ground-floor retail** is a mixed-use development at 305 Broadway in Long Branch City, Monmouth County, NJ. As of November 24, 2026, it is under construction according to web research. Latest record: Press coverage reports a March 24, 2026 groundbreaking, and Patch (posted Mar 26, 2026) says construction began that month with opening expected in late spring… What usually happens next: completion and occupancy.

Stage: Under construction · Press coverage reports a March 24, 2026 groundbreaking, and Patch (posted Mar 26, 2026) says construction began that month with opening expected in late spring 2027. · web research checked Nov 19, 2026 · [source](https://patch.com/new-jersey/longbranch/four-story-apartment-building-being-built-center-long-branch) AI research

Usually next: completion and occupancy.

## About this project

A multifamily residential building with first-floor retail space is being built at 305 Broadway in Long Branch City, Monmouth County. The project includes grading, stormwater management, and site amenities.

Official description: Construction of a multifamily residential building with first-floor retail space, grading, stormwater management, and site amenities.

- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Mixed use
- **Status:** 30-day public comment period

## Project history

- **2025-06-04** · #1325-25-0002.1 · State environmental permit application (NJDEP)
- **2025-06-04** · NJDEP coastal (CAFRA) permit 1325-25-0002.1: 30-day public comment period · [source](https://dspace.njstatelib.org/items/c363675f-b9a3-4b10-85a2-54a8c0243fac)
- **2025-02-21** · NJDEP coastal (CAFRA) permit 1325-25-0002.1: application filed · [source](https://dspace.njstatelib.org/items/c363675f-b9a3-4b10-85a2-54a8c0243fac)

[County plan review office →](https://dspace.njstatelib.org/items/c363675f-b9a3-4b10-85a2-54a8c0243fac)

## The full picture AI research · Nov 19, 2026

The Elbie is a four-story rental apartment building with shops on the ground floor. It is going up at 305 Broadway in Long Branch. Press reports describe 78 apartments (Patch says 79). They are a mix of one- and two-bedroom homes. The ground floor has about 4,000 square feet of retail space.

The corner lot was long vacant and sits across from City Hall and the library. The developers, Downeaster Development and TANTUM Real Estate, held a groundbreaking on March 24, 2026. Opening is expected in late spring 2027.

The developers also agreed to streetscape work, including a decorative crosswalk, landscaping and a clock tower element. No opposition was found. No topping-out or apartment leasing announcement was found either.

### What it could mean nearby

- Replaces a long-vacant corner lot with about 78 homes and ground-floor shops across from City Hall.
- Close to the Long Branch train station, downtown shops and the beach, so some residents may not need a car.
- Streetscape upgrades (crosswalk, landscaping, clock tower element) are planned at the developers' agreement with the city.
- Press reports mention on-site parking. No traffic study was found.

### Where it stands

Work is under way. A groundbreaking was held on March 24, 2026, and opening is expected in late spring 2027. No topping-out or leasing news was found as of November 2026, though only press coverage and a retail listing were checked. Note: Patch reports 79 apartments while most outlets (MAREJ, NJBIZ, RE-NJ) report 78, and the county summary gives no count.

- **May 2027** Expected opening (late spring 2027)
- **Mar 24, 2026** Groundbreaking held for The Elbie
- **Jun 4, 2025** 30-day public comment period on the NJDEP coastal (CAFRA) permit
- **Feb 21, 2025** CAFRA permit application filed

### Who's behind it

Downeaster Development and TANTUM Real Estate · Downeaster Development is the lead developer named in press coverage. TANTUM is a women-owned Jersey City firm that focuses on transit-oriented downtown projects.

### Around the web

- [Four-story apartment building being built in center of Long Branch](https://patch.com/new-jersey/longbranch/four-story-apartment-building-being-built-center-long-branch) — Patch · Mar 26, 2026Reports 79 apartments, a four-story building on a long-vacant lot across from City Hall, construction begun, and opening expected late spring 2027.
- [Downeaster Development, TANTUM Real Estate break ground on The Elbie](https://www.marejournal.com/post/downeaster-development-tantum-real-estate-break-ground-on-the-elbie-long-branch) — MAREJReports 78 units and about 4,000 sq ft of ground-floor retail.
- [Downeaster, TANTUM break ground on 78-unit rental project in Long Branch](https://re-nj.com/downeaster-tantum-break-ground-on-78-unit-rental-project-in-long-branch/) — Real Estate NJReports the groundbreaking and 78 rental units.
- [The Elbie 78-unit mixed-use, Long Branch](https://njbiz.com/long-branch-elbie-78-unit-mixed-use/) — NJBIZ · Mar 2026Reports 78 units, about 4,000 sq ft of retail and amenities (found via search summary; the page itself was not readable).
- [The Elbie Breaks Ground At 305 Broadway In Long Branch, New Jersey](https://newyorkyimby.com/2026/03/the-elbie-breaks-ground-at-305-broadway-in-long-branch-new-jersey.html) — New York YIMBY · Mar 2026Describes unit mix and the groundbreaking at this address.
- [305 Broadway, Long Branch, NJ listing](https://www.cityfeet.com/cont/listing/305-broadway-long-branch-nj-07740/cs42035718) — CityFeetCommercial listing for the ground-floor retail space at this address, described as a 2027 building.

Planning terms explained

- **CAFRA:** The Coastal Area Facility Review Act, a state law requiring NJDEP permits for larger developments near the coast.
- **Mixed use:** A building combining homes with shops or offices.
- **Groundbreaking:** A ceremony marking the start of construction.
- **Streetscape:** Public-space improvements such as crosswalks, landscaping and street furniture.
- **Transit-oriented development:** Housing built near train or bus service so residents can get around without a car.

Researched by AI from public sources on Nov 19, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

In New Jersey, the Long Branch City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Long Branch City's meeting agendas →](https://www.google.com/search?q=Long+Branch+City+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [One- and two-family building, Long Branch](https://plannednearby.com/x/njp-1325-268-1-01) — 0.3 mi · single-family homes · Long Branch City · filed 2026-06-05
- [Retail building, Block 311 Lot 1.03](https://plannednearby.com/x/njp-1325-311-1-03) — 0.4 mi · 19,003 sq ft non-residential, retail & commercial · Long Branch City · filed 2024-03-19
- [Retail building, Block 311 Lot 1.04](https://plannednearby.com/x/njp-1325-311-1-04) — 0.5 mi · 156,306 sq ft non-residential, retail & commercial · Long Branch City · filed 2024-03-19
- [Retail buildings, Block 283.01 Lot 1.03](https://plannednearby.com/x/njp-1325-283-01-1-03) — 0.5 mi · 191,615 sq ft non-residential, retail & commercial · Long Branch City · filed 2024-03-19
- [10 new townhomes](https://plannednearby.com/x/njb-1325-25-0006) — 0.6 mi · 10 homes, townhomes · Long Branch City · filed 2026-05-19
- [14-unit apartment building](https://plannednearby.com/x/njb-1325-26-0002) — 0.7 mi · 14 homes, apartments · Long Branch City · filed 2026-02-10

[See everything nearby on a map →](https://plannednearby.com/near#40.30401,-73.99294,Long%20Branch%20City)

---

Source page: https://plannednearby.com/x/njb-1325-25-0002

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
