[Monmouth County](https://plannednearby.com/c/monmouth-nj/) · [Long Branch City](https://plannednearby.com/c/monmouth-nj/long-branch-city) · #1325-25-0006.1

# 10 new townhomes

85 Chelsea Ave, Long Branch City, NJ · 10 homes, townhomes

In short: **10 new townhomes** is a townhome development at 85 Chelsea Ave in Long Branch City, Monmouth County, NJ. It would add 10 homes. Its estimated construction value is about $3.7M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: NJDEP flood hazard permit 1325-25-0006.1: approved (May 19, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · NJDEP flood hazard permit 1325-25-0006.1: approved · May 19, 2026 · [source](https://dspace.njstatelib.org/items/454ee5b0-9e87-46af-9e69-a745e132b6ea)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Ten new townhomes with an access aisle and parking are proposed at 85 Chelsea Avenue in Long Branch City.

Official description: Construction of ten new townhomes with an access aisle and parking.

- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Townhomes
- **Status:** approved

## Project history

- **2026-05-19** · #1325-25-0006.1 · State environmental permit application (NJDEP)
- **2026-05-19** · NJDEP flood hazard permit 1325-25-0006.1: approved · [source](https://dspace.njstatelib.org/items/454ee5b0-9e87-46af-9e69-a745e132b6ea)
- **2026-02-25** · NJDEP flood hazard permit 1325-25-0006.1: application filed · [source](https://dspace.njstatelib.org/items/454ee5b0-9e87-46af-9e69-a745e132b6ea)

[County plan review office →](https://dspace.njstatelib.org/items/454ee5b0-9e87-46af-9e69-a745e132b6ea)

## The full picture AI research · Nov 20, 2026

Ten new townhomes are proposed at 85 Chelsea Avenue in Long Branch City, with an access aisle (a shared driveway) and parking. County records show the site needed a state flood hazard permit. The state environmental agency approved that permit on 2026-05-19, after the application was filed on 2026-02-25.

No developer website, news story, city board agenda or minutes, or home listing for this address turned up. Nothing found shows whether construction has started or whether homes are for sale. Other new single-family homes are being listed on Chelsea Avenue, but they are separate projects.

The record page for the permit could not be opened for review, so the summary relies on the county facts above.

### What it could mean nearby

- Ten homes would add housing near the Chelsea Avenue corridor, where other new homes are already being built.
- The access aisle and parking would decide how cars enter and leave the site; no traffic study was found.
- The flood hazard permit means the site is in a regulated flood area, so the buildings must meet state flood-protection rules.

### Where it stands

The state flood hazard permit was approved on 2026-05-19. No local board approval, building permit or construction start was found, and the usual next steps are city site plan approval where not already given, then building permits.

- **May 19, 2026** NJDEP flood hazard permit approved
- **Feb 25, 2026** NJDEP flood hazard permit application filed

Planning terms explained

- **Flood hazard area permit:** A state permit required before building in an area that can flood, to make sure the work is designed safely.
- **Access aisle:** A shared driveway or lane that lets cars reach parking and the homes.
- **Site plan:** A detailed drawing, reviewed by the city, showing buildings, parking, drainage and driveways.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 20, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Long Branch City Planning Board or Zoning Board of Adjustment would hear any local site plan or variance application; residents can ask the city planning office for agendas and hearing dates.

In New Jersey, the Long Branch City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Long Branch City's meeting agendas →](https://www.google.com/search?q=Long+Branch+City+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$3.7M**

- ~140 roofing squares
- ~10 HVAC systems
- ~10 kitchens / 20+ bathrooms
- ~20,000 sq ft of finished living space

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Retail buildings, Block 283.01 Lot 1.03](https://plannednearby.com/x/njp-1325-283-01-1-03) — 0.3 mi · 191,615 sq ft non-residential, retail & commercial · Long Branch City · filed 2024-03-19
- [Retail building, Block 311 Lot 1.04](https://plannednearby.com/x/njp-1325-311-1-04) — 0.3 mi · 156,306 sq ft non-residential, retail & commercial · Long Branch City · filed 2024-03-19
- [Retail building, Block 311 Lot 1.03](https://plannednearby.com/x/njp-1325-311-1-03) — 0.3 mi · 19,003 sq ft non-residential, retail & commercial · Long Branch City · filed 2024-03-19
- [One- and two-family building, Long Branch](https://plannednearby.com/x/njp-1325-268-1-01) — 0.5 mi · single-family homes · Long Branch City · filed 2026-06-05
- [Multifamily building, Long Branch City](https://plannednearby.com/x/njp-1325-215-3) — 0.6 mi · apartments · Long Branch City · filed 2025-02-24
- [Multifamily building with ground-floor retail](https://plannednearby.com/x/njb-1325-25-0002) — 0.6 mi · mixed use · Long Branch City · filed 2025-06-04

[See everything nearby on a map →](https://plannednearby.com/near#40.30169,-73.98107,Long%20Branch%20City)

---

Source page: https://plannednearby.com/x/njb-1325-25-0006

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
