Monmouth County · Neptune Township · #1334-04-0007.2
Mixed-use hotel and residential redevelopment
17 Spray Ave, Neptune Township, NJ · 49 homes, 7,353 sq ft non-residential, mixed use
In short: Mixed-use hotel and residential redevelopment is a mixed-use development at 17 Spray Ave in Neptune Township, Monmouth County, NJ. It would add 49 homes and 7,353 sq ft of non-residential space. Its estimated construction value is about $13.7M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: County records show the NJDEP coastal (CAFRA) permit approved on 2026-04-09, and no source found shows building permits or construction. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
At 17 Spray Ave in Neptune Township, a 5-story, 40-room historic hotel would be replaced, and the site would add two multi-family buildings with 39 units, ten detached single-family homes, 7,353 sq ft of first-floor retail, parking, a waterfront promenade and recreation areas.
Official description: The North End Redevelopment replaces a 5-story, 40-room historic hotel and adds two multi-family buildings with 39 units, ten detached single-family homes, 7,353 sq ft of first-floor retail, parking, a waterfront promenade, and recreation areas.
- Applicant
- Og North End Development
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Mixed use
- Status
- approved
The full picture AI research · Nov 18, 2026
The project is Ocean Grove North End, an oceanfront redevelopment on the long-vacant land between the Ocean Grove boardwalk, Wesley Lake and Spray Avenue in Neptune Township. Plans call for a 40-room boutique hotel and 39 condominium units. They also include ten single-family homes, a small amount of ground-floor retail (about 7,353 sq ft), underground parking, and a waterfront promenade with recreation areas.
The developer cut the plan at the township's request. Condos fell from 78 to 39 and hotel rooms from 80 to 40. The township adopted an amended redevelopment plan in 2024. Some residents and the town's historic preservation body raised objections, mainly over how the plan fits Ocean Grove's historic character.
The state coastal (CAFRA) permit was approved on 2026-04-09. No sign of groundbreaking, sales or construction was found.
What it could mean nearby
- The developer would rebuild the township-owned Wesley Lake wall and a public promenade, adding waterfront access.
- A 2024 trade report estimated about $1.9 million a year in property taxes, roughly half earmarked for schools.
- Underground parking (155 spaces reported) is meant to limit street parking pressure.
- The 40-room hotel and ground-floor retail would bring new visitors and some jobs to the north end of the boardwalk.
Where it stands
The state coastal (CAFRA) permit was approved on 2026-04-09, after the township adopted its amended redevelopment plan in 2024. No source found shows construction starting. Remaining local approvals and building permits would normally come before work begins. Note: The county summary says a historic hotel would be replaced, but news coverage describes the site as vacant land since the old North End Hotel was demolished decades ago, with the new hotel being built from scratch.
- Apr 9, 2026 NJDEP coastal (CAFRA) permit 1334-04-0007.2 approved
- Nov 6, 2025 CAFRA permit application filed
- Dec 2024 Developer said it expected final Planning Board approval soon and targeted a 2025 groundbreaking
- Apr 2024 Township adopted amended redevelopment plan
- Feb 2024 Township and developer signed a settlement agreement
Who's behind it
OG North End Development, LLC · A joint venture that includes an affiliate of MB1 Capital Partners, formed to carry out the Ocean Grove North End redevelopment.
Around the web
- NJDEP CAFRA permit 1334-04-0007.2NJ State Library · Apr 9, 2026County record of the CAFRA application (2025-11-06) and approval (2026-04-09).
- Long-awaited oceanfront development in Ocean Grove planned for 2025ROI-NJ · Dec 20, 2024Describes the 40-room hotel, 39 condos, 10 homes, parking, vacant land history and the 2025 groundbreaking target.
- Ocean Grove hotel, condo plan moves ahead; historic group won't have any control over itAsbury Park Press via YahooCovers the township advancing the plan and the historic preservation dispute.
- NJDEP grants CAFRA approval to OGNED to go ahead with the North End projectBlogfinger · Mar 14, 2024Local blog report of an earlier NJDEP CAFRA approval for the same developer and project.
Planning terms explained
- CAFRA
- The Coastal Area Facility Review Act, a state law requiring NJDEP permits for larger developments near the coast.
- Redevelopment plan
- A township-adopted set of rules for what can be built on a site designated as needing redevelopment.
- Redeveloper
- The private company that contracts with the township to carry out a redevelopment plan.
- Promenade
- A public walkway, here along the waterfront by Wesley Lake.
Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Neptune Township's Planning Board and Township Committee handle local approvals, and residents can comment at their public meetings; check the township website for agendas.
In New Jersey, the Neptune Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Neptune Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $13.7M
- ~294 roofing squares
- ~49 HVAC systems
- ~49 kitchens / 98+ bathrooms
- ~49,000 sq ft of finished living space
- ~24 roofing squares (assumes 3 stories)
- ~18 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Multifamily building, Block 808, Lot 81.0 mi · apartments · Neptune Township · filed 2025-04-10
- Four-story mixed-use building1.7 mi · 9 homes, mixed use · Neptune Township · filed 2026-09-24
- Building permit (new construction) in Wall Township1.7 mi · apartments · Wall Township · filed 2024-12-12
- Expansion of lifeguard and restroom comfort buildings1.8 mi · 400 sq ft non-residential, recreation · Neptune Township · filed 2025-08-19
- Storage building, Tinton Falls Borough2.1 mi · 29,900 sq ft non-residential, warehouse & storage · Tinton Falls Borough · filed 2025-09-26
- Factory building, Block 144 Lot 5.012.1 mi · 28,590 sq ft non-residential, industrial · Tinton Falls Borough · filed 2025-02-03