Morris County · Long Hill Township · #1430-24-0005.1
Two-story mixed-use building with apartments
283 Main Avenue, Long Hill Township, NJ · 2 homes, 3,200 sq ft non-residential, mixed use
In short: Two-story mixed-use building with apartments is a mixed-use development at 283 Main Avenue in Long Hill Township, Morris County, NJ. It would add 2 homes and 3,200 sq ft of non-residential space. Its estimated construction value is about $1.3M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: The county record shows NJDEP flood hazard permit 1430-24-0005.1 approved on 2025-05-13, and the searches found nothing later. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
A one-story building at 283 Main Avenue in Long Hill Township would be demolished and replaced with a two-story mixed-use building containing about 3,200 sq ft of retail/office space and two apartments. The site is in the Passaic River flood hazard area.
Official description: Demolition of a one-story building to build a two-story mixed-use building with 3,200 sq ft of retail/office space and two apartments, within the Passaic River flood hazard area.
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Mixed use
- Status
- approved
The full picture AI research · Nov 10, 2026
A one-story commercial building at 283 Main Avenue in the Stirling area of Long Hill Township would be torn down. A two-story building would replace it. The new building would have about 3,200 square feet of shops or offices and two apartments.
The site is in the Passaic River flood hazard area, so the state environmental agency (NJDEP) had to approve the work. NJDEP approved its flood hazard permit on 2025-05-13, after an application filed on 2024-12-19.
No news coverage, township hearing records, developer pages, listings or construction updates were found for this address. Nothing found shows whether demolition or building has started, or who will occupy the space.
What it could mean nearby
- Two new apartments would add a small number of homes near the downtown Stirling area.
- About 3,200 sq ft of retail or office space could add a small number of local businesses or jobs.
- The state flood permit means the design had to meet flood-hazard-area rules, which are meant to protect the building and avoid worsening flooding.
Where it stands
NJDEP approved the flood hazard permit on 2025-05-13. No township approval, building permit or construction start was found, so those steps are unconfirmed. Local land-use and building approvals usually come next, followed by demolition and construction.
- May 13, 2025 NJDEP flood hazard permit approved
- Dec 19, 2024 NJDEP flood hazard permit application filed
Planning terms explained
- Flood hazard area permit
- A state (NJDEP) approval needed to build in or near a flood-prone river area, confirming the work meets flood-safety rules.
- Mixed use
- A building that combines different uses, here shops or offices on the ground floor and apartments.
- Demolition
- Tearing down the existing building so the site can be redeveloped.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The state flood permit has already been approved, so any remaining township approvals would be handled by Long Hill Township's land-use boards, which meet publicly. Residents can check the township website or planning office for agendas.
In New Jersey, the Long Hill Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Long Hill Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $1.3M
- ~12 roofing squares
- ~2 HVAC systems
- ~2 kitchens / 4+ bathrooms
- ~2,000 sq ft of finished living space
- ~10 roofing squares (assumes 3 stories)
- ~8 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Block 13302, Lot 16.011, Long Hill Township0.4 mi · single-family homes · Long Hill Township · filed 2026-09-02
- Residential development with stormwater outfall1.1 mi · single-family homes · Long Hill Township · filed 2026-02-02
- Mixed-use building with apartments on Main Ave1.2 mi · 2 homes, 3,200 sq ft non-residential, mixed use · Long Hill Township · filed 2024-12-19
- Residential/retail building1.3 mi · mixed use · Long Hill Township · filed 2025-07-23
- 9 Broadview Rd1.5 mi · 1 home, single-family homes · Long Hill Township · filed 2025-03-07
- Multi-unit senior housing project1.5 mi · senior living · Bernards Township · filed 2026-07-22