Ocean County · Jackson Township · #1511-22-0013.1
Office and warehouse on Wright Debow Road
Wright Debow Road, Jackson Township, NJ · 18,000 sq ft non-residential, warehouse & storage
In short: Office and warehouse on Wright Debow Road is a warehouse and storage development in Jackson Township, Ocean County, NJ. It would add 18,000 sq ft of non-residential space. Its estimated construction value is about $2.3M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: The county record lists the NJDEP freshwater wetlands permit as approved on 2026-03-24, and no later source was found. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
An office building and an 18,000 sq ft warehouse have been approved on Wright Debow Road, with parking and stormwater features. The project requires fill within a verified isolated wetland buffer.
Official description: An office building and an 18,000 square foot warehouse are proposed, with parking and stormwater features, requiring fill in a verified isolated wetland buffer.
- Applicant
- Down To Earth Farm LLC
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Warehouse & storage
- Status
- approved
The full picture AI research · Nov 21, 2026
County records show an approved plan for an office building and an 18,000 sq ft warehouse on Wright Debow Road in Jackson Township. The plan includes parking and stormwater features. It also needs fill inside the buffer of an isolated wetland. The buffer is the protected strip around a wetland.
The state environmental agency approved the freshwater wetlands permit on 2026-03-24. The application was filed on 2023-09-25. The filing names Down To Earth Farm LLC.
No news coverage, township agenda or minutes, builder page, listing or business notice was found for this project. Nothing found shows construction started, a tenant, or an opening. The exact site and its current condition could not be confirmed online.
What it could mean nearby
- Warehouse use could add truck and employee traffic on Wright Debow Road, but no traffic study was found.
- The wetland buffer fill means some protected land will be altered under a state permit.
Where it stands
The state wetlands permit was approved on 2026-03-24, and no later stage was found. Local building permits and construction usually come after that, but no source shows they have happened.
- Mar 24, 2026 NJDEP freshwater wetlands permit approved
- Sep 25, 2023 Wetlands permit application filed
Who's behind it
Down To Earth Farm LLC
Planning terms explained
- Freshwater wetlands permit
- A state approval needed before building in or next to protected wetlands.
- Wetland buffer
- A protected strip of land around a wetland that limits development.
- Isolated wetland
- A wetland that is not connected to a stream or other waterway.
- Stormwater features
- Basins or drains that collect and slow rain runoff from paved and roofed areas.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Residents can ask the Jackson Township Planning Board about local site plan matters, and NJDEP's Division of Land Resource Protection handles the wetlands permit.
In New Jersey, the Jackson Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Jackson Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $2.3M
- ~180 roofing squares (assumes 1 story)
- ~45 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Development filing in Jackson0.1 mi · other · Jackson · filed 2026-07-08
- Residential subdivision0.3 mi · single-family homes · Jackson Township · filed 2024-11-14
- Residential construction, Block 14001, Lot 32.180.4 mi · single-family homes · Jackson Township · filed 2026-02-26
- Business building, Block 5301, Lot 120.4 mi · 22,282 sq ft non-residential, office · Jackson Township · filed 2025-05-05
- Block 6501, Lot 52.010.4 mi · 12,772 sq ft non-residential, office · Jackson Township · filed 2026-08-03
- Business building, Block 8701, Lot 18.010.5 mi · 73,725 sq ft non-residential, office · Jackson Township · filed 2025-10-20