[Ocean County](https://plannednearby.com/c/ocean-nj/) · [Lacey Township](https://plannednearby.com/c/ocean-nj/lacey-township) · #1512-22-0025.1

# 26-lot residential subdivision in Lacey Township

Lacey Township, NJ · 26 homes, single-family homes

In short: **26-lot residential subdivision in Lacey Township** is a single-family home development in Lacey Township, Ocean County, NJ. It would add 26 homes. Its estimated construction value is about $14.6M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: NJDEP coastal (CAFRA) permit 1512-22-0025.1: 30-day public comment period (October 21, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · NJDEP coastal (CAFRA) permit 1512-22-0025.1: 30-day public comment period · Oct 21, 2026 · [source](https://dspace.njstatelib.org/items/0ecbdca5-10ba-4c86-b145-73fa25f13f9c)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A 26-lot residential subdivision in Lacey Township with new roadways and a stormwater management system.

Official description: Proposes a 26-lot residential subdivision with roadways and a stormwater management system under an individual permit.

- **Applicant:** [Ridgemont Homes Inc](https://plannednearby.com/f/ridgemont-homes-inc)
- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Subdivision
- **Status:** 30-day public comment period

## Project history

- **2026-10-21** · #1512-22-0025.1 · State environmental permit application (NJDEP) · 26 lots/units
- **2026-10-21** · NJDEP coastal (CAFRA) permit 1512-22-0025.1: 30-day public comment period · [source](https://dspace.njstatelib.org/items/0ecbdca5-10ba-4c86-b145-73fa25f13f9c)
- **2022-06-23** · NJDEP coastal (CAFRA) permit 1512-22-0025.1: application filed · [source](https://dspace.njstatelib.org/items/0ecbdca5-10ba-4c86-b145-73fa25f13f9c)

[County plan review office →](https://dspace.njstatelib.org/items/0ecbdca5-10ba-4c86-b145-73fa25f13f9c)

## The full picture AI research · Nov 19, 2026

Ridgemont Homes Inc has proposed a 26-lot subdivision of single-family homes in Lacey Township, Ocean County. County records say it includes new roads and a stormwater system, which collects and manages rain runoff from the new streets and roofs.

Because the site is in the state's coastal zone, it needs a state coastal permit (CAFRA) from the NJ Department of Environmental Protection. The application was filed in June 2022. On 2021-10-21 the state opened a 30-day public comment period on it. That date comes from the county record and is shown on this page as 2026-10-21.

No developer website, news story, township agenda or minutes, home listing or construction report specific to this project turned up online. What is on the site today could not be confirmed. The county records don't say whether any work has started.

### What it could mean nearby

- Up to 26 new single-family households would be added, which could increase traffic on the new streets and the roads they connect to.
- The new roadways and stormwater system would be built as part of the project, which would change how rain runoff drains from the site.

### Where it stands

The state coastal (CAFRA) permit is still under review, and the latest record is a public comment period that opened 2026-10-21. After comments are considered, the state decides on the permit. Township approvals and construction permits would come before building starts.

- **Oct 21, 2026** NJDEP opens 30-day public comment period on the CAFRA permit
- **Jun 23, 2022** CAFRA permit application filed

### Who's behind it

Ridgemont Homes Inc

### Around the web

- [NJDEP CAFRA permit 1512-22-0025.1 record](https://dspace.njstatelib.org/items/0ecbdca5-10ba-4c86-b145-73fa25f13f9c) — New Jersey State Library · Oct 21, 2026Shows the CAFRA application filing and the public comment period. The page could not be opened directly, so the details come from the county record.

Planning terms explained

- **CAFRA:** The Coastal Area Facility Review Act, a state law requiring NJDEP permits for larger developments near the coast.
- **Subdivision:** Dividing a larger piece of land into separate lots that can be built on or sold.
- **Stormwater management system:** Basins, pipes and other features that collect and slow rain runoff so it doesn't cause flooding or pollution.
- **Public comment period:** A set time when the public can send written comments to the agency before it decides.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 19, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** NJDEP decides on the coastal permit, and residents can send comments to its coastal permitting program during the 30-day period that opened 2026-10-21. Check the NJDEP notice for the exact deadline and how to submit.

In New Jersey, the Lacey Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Lacey Township's meeting agendas →](https://www.google.com/search?q=Lacey+Township+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$14.6M**

- ~832 roofing squares
- ~26 HVAC systems
- ~26 kitchens / 52+ bathrooms
- ~72,800 sq ft of finished living space

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Commercial site plan on Lacey Road](https://plannednearby.com/x/ocean-lt791a) — 0.1 mi · retail & commercial · Lacey Township · filed 2026-03-25
- [Commercial site plan on Lacey Road](https://plannednearby.com/x/ocean-lt791b) — 0.1 mi · retail & commercial · Lacey Township · filed 2026-09-09
- [Development filing in Lacey](https://plannednearby.com/x/ocean-lt317-12) — 0.1 mi · other · Lacey · filed 2026-07-08
- [100-megawatt battery energy storage facility](https://plannednearby.com/x/njb-1512-26-0008) — 0.2 mi · industrial · Lacey Township · filed 2026-07-15
- [Commercial building addition on Manchester Avenue](https://plannednearby.com/x/ocean-lt925) — 0.2 mi · 1,287 sq ft non-residential, retail & commercial · Lacey Township · filed 2025-04-02
- [Residential minor plan on Deerhead Lake Drive](https://plannednearby.com/x/ocean-lt931) — 0.2 mi · single-family homes · Lacey Township · filed 2025-09-03

[See everything nearby on a map →](https://plannednearby.com/near#39.85879,-74.20732,Lacey%20Township)

---

Source page: https://plannednearby.com/x/njb-1512-22-0025

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
