In short: 3-story self-storage facility is a warehouse and storage development at 555 Hamburg Tpke in Wayne Township, Passaic County, NJ. It will add 22,112 sq ft of non-residential space. Its estimated construction value is about $2.9M, a rough estimate from its size. As of November 24, 2026, it is under construction according to web research. Latest record: A September 2026 trade report says construction is under way at 555 Hamburg Turnpike with completion expected in early 2028. What usually happens next: completion and occupancy.

Under construction A September 2026 trade report says construction is under way at 555 Hamburg Turnpike with completion expected in early 2028. · web research checked Nov 10, 2026 · source AI research
  1. Proposed
  2. In reviewSep 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: completion and occupancy.

About this project

A 3-story self-storage facility with a 22,112 sq ft footprint and 586 storage units, plus parking, landscaping, lighting and stormwater facilities at 555 Hamburg Turnpike in Wayne Township.

Official description: Construction of a 3-story self-storage facility with a 22,112 SF footprint and 586 storage units, plus parking, landscaping, lighting, and stormwater facilities.

Plan type
State environmental permit application (NJDEP)
Land use
Warehouse & storage
Status
approved

Project history

  • 2025-02-11 · #1614-21-0012.1 · State environmental permit application (NJDEP) · 22,112 sq ft
  • 2025-02-11 · NJDEP flood hazard permit 1614-21-0012.1: approved · source
  • 2024-09-12 · NJDEP flood hazard permit 1614-21-0012.1: application filed · source

County plan review office →

The full picture AI research · Nov 10, 2026

The project is a three-story, climate-controlled self-storage building at 555 Hamburg Turnpike in Wayne. County records describe a 22,112 sq ft footprint and 586 units, plus parking, landscaping, lighting and stormwater facilities. Trade press gives about 85,000 rentable sq ft. The site is about 3.5 acres. It had a single-family home for decades.

The township zoning board turned down an earlier, larger version in August 2023, citing its size and height. The developer cut the building by a floor. In April 2024 the board approved self-storage as a use on the site, and site plan review was to follow. In February 2025 the state issued a flood hazard permit.

Trade press from September 2026 reports that the developer closed a $24 million construction loan. It says Extra Space Storage will operate the building, that construction is under way, and that completion is expected in early 2028.

What it could mean nearby

Where it stands

Construction is reported under way as of September 2026, after the zoning board's 2024 use approval and the state's February 2025 flood permit. Completion and opening are expected in early 2028. Note: County records give a 22,112 sq ft footprint, while trade press cites about 85,330 net rentable sq ft. These are probably different measures, since the building has three floors.

Who's behind it

Basis Industrial · A Florida-based owner-operator of industrial and self-storage properties, reported to have Extra Space Storage as the operator here.

Around the web

Planning terms explained
Use variance
Permission to use land in a way the zoning rules don't normally allow, such as storage in an office zone.
Zoning Board of Adjustment
The local board that decides requests for exceptions to zoning rules.
Site plan approval
Board review of a project's layout, including parking, landscaping, drainage and traffic flow.
Flood hazard permit
A state environmental permit for building near streams or in flood-prone areas.
Bifurcated application
An application split so the board decides the use first and the detailed site plan later.

Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Wayne Township Zoning Board of Adjustment handled the use approval. Residents can comment at its public meetings, and any remaining site plan review would also be public. Construction appears to be well past that stage.

In New Jersey, the Wayne Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Wayne Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $2.9M