[Passaic County](https://plannednearby.com/c/passaic-nj/) · [Wayne Township](https://plannednearby.com/c/passaic-nj/wayne-township) · #1614-21-0012.1

# 3-story self-storage facility

555 Hamburg Tpke, Wayne Township, NJ · 22,112 sq ft non-residential, warehouse & storage

In short: **3-story self-storage facility** is a warehouse and storage development at 555 Hamburg Tpke in Wayne Township, Passaic County, NJ. It will add 22,112 sq ft of non-residential space. Its estimated construction value is about $2.9M, a rough estimate from its size. As of November 24, 2026, it is under construction according to web research. Latest record: A September 2026 trade report says construction is under way at 555 Hamburg Turnpike with completion expected in early 2028. What usually happens next: completion and occupancy.

Stage: Under construction · A September 2026 trade report says construction is under way at 555 Hamburg Turnpike with completion expected in early 2028. · web research checked Nov 10, 2026 · [source](https://rebusinessonline.com/basis-industrial-receives-24m-construction-loan-for-self-storage-project-in-wayne-new-jersey/) AI research

Usually next: completion and occupancy.

## About this project

A 3-story self-storage facility with a 22,112 sq ft footprint and 586 storage units, plus parking, landscaping, lighting and stormwater facilities at 555 Hamburg Turnpike in Wayne Township.

Official description: Construction of a 3-story self-storage facility with a 22,112 SF footprint and 586 storage units, plus parking, landscaping, lighting, and stormwater facilities.

- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Warehouse & storage
- **Status:** approved

## Project history

- **2025-02-11** · #1614-21-0012.1 · State environmental permit application (NJDEP) · 22,112 sq ft
- **2025-02-11** · NJDEP flood hazard permit 1614-21-0012.1: approved · [source](https://dspace.njstatelib.org/items/89bb1ab2-2252-48a4-81ba-c9c23a4549e3)
- **2024-09-12** · NJDEP flood hazard permit 1614-21-0012.1: application filed · [source](https://dspace.njstatelib.org/items/89bb1ab2-2252-48a4-81ba-c9c23a4549e3)

[County plan review office →](https://dspace.njstatelib.org/items/89bb1ab2-2252-48a4-81ba-c9c23a4549e3)

## The full picture AI research · Nov 10, 2026

The project is a three-story, climate-controlled self-storage building at 555 Hamburg Turnpike in Wayne. County records describe a 22,112 sq ft footprint and 586 units, plus parking, landscaping, lighting and stormwater facilities. Trade press gives about 85,000 rentable sq ft. The site is about 3.5 acres. It had a single-family home for decades.

The township zoning board turned down an earlier, larger version in August 2023, citing its size and height. The developer cut the building by a floor. In April 2024 the board approved self-storage as a use on the site, and site plan review was to follow. In February 2025 the state issued a flood hazard permit.

Trade press from September 2026 reports that the developer closed a $24 million construction loan. It says Extra Space Storage will operate the building, that construction is under way, and that completion is expected in early 2028.

### What it could mean nearby

- Traffic: storage use generally brings fewer daily trips than offices or retail, though no traffic figures were found. The board was to review traffic circulation during site plan review.
- Stormwater and flooding: the site has steep slopes and a stream tributary, which is why a state flood hazard permit was needed.
- Roadway: the zoning board coverage says the county plans to take up to 12 feet of frontage along Hamburg Turnpike.
- Jobs and housing: no homes are proposed. Storage facilities typically employ few people.

### Where it stands

Construction is reported under way as of September 2026, after the zoning board's 2024 use approval and the state's February 2025 flood permit. Completion and opening are expected in early 2028. Note: County records give a 22,112 sq ft footprint, while trade press cites about 85,330 net rentable sq ft. These are probably different measures, since the building has three floors.

- **Sep 2026** Trade press reports a $24M construction loan, construction under way, and completion expected early 2028
- **Jun 2026** Sale of the site to the developer reported to have closed, along with the construction loan
- **Feb 11, 2025** NJDEP flood hazard permit 1614-21-0012.1 approved
- **Nov 2024** Earlier site purchase reported at $1.1M
- **Sep 12, 2024** NJDEP flood hazard permit application filed
- **Apr 2024** Wayne Zoning Board of Adjustment approved self-storage use for a reduced-size building

### Who's behind it

Basis Industrial · A Florida-based owner-operator of industrial and self-storage properties, reported to have Extra Space Storage as the operator here.

### Around the web

- [Basis Industrial receives $24M construction loan for self-storage project in Wayne, New Jersey](https://rebusinessonline.com/basis-industrial-receives-24m-construction-loan-for-self-storage-project-in-wayne-new-jersey/) — REBusiness Online · Sep 16, 2026Reports 586 units, Extra Space as operator, construction under way and early 2028 completion.
- [Basis Industrial lands $24 million construction loan for long-awaited Wayne self-storage project](https://re-nj.com/basis-industrial-lands-24-million-construction-loan-for-long-awaited-wayne-self-storage-project/) — Real Estate NJSearch results indicate it covers the same loan. The page itself could not be opened.
- [Wayne site had single-family home for 75 years. How did zoning board update its use?](https://www.yahoo.com/news/wayne-had-single-family-home-081215996.html) — Yahoo News · Apr 11, 2024The zoning board approved self-storage use at 555 Hamburg Turnpike for a reduced building, with site plan review to follow.
- [Wayne zoning board rejects 'massive' storage center for Hamburg Turnpike. Here's why](https://www.yahoo.com/news/wayne-zoning-board-rejects-massive-081806378.html) — Yahoo News · Aug 23, 2023The board denied the earlier, larger proposal 5-2 over size and height.
- [555 Paterson Hamburg Turnpike](https://traded.co/deals/new-jersey/self-storage/sale/555-paterson-hamburg-turnpike/) — TradedSale record lists the developer as buyer with a $24M construction loan and a June 2026 closing.
- [NJDEP flood hazard permit 1614-21-0012.1](https://dspace.njstatelib.org/items/89bb1ab2-2252-48a4-81ba-c9c23a4549e3) — NJ State Library · Feb 11, 2025County record of the flood hazard permit application and approval. The page could not be opened.

Planning terms explained

- **Use variance:** Permission to use land in a way the zoning rules don't normally allow, such as storage in an office zone.
- **Zoning Board of Adjustment:** The local board that decides requests for exceptions to zoning rules.
- **Site plan approval:** Board review of a project's layout, including parking, landscaping, drainage and traffic flow.
- **Flood hazard permit:** A state environmental permit for building near streams or in flood-prone areas.
- **Bifurcated application:** An application split so the board decides the use first and the detailed site plan later.

Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Wayne Township Zoning Board of Adjustment handled the use approval. Residents can comment at its public meetings, and any remaining site plan review would also be public. Construction appears to be well past that stage.

In New Jersey, the Wayne Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Wayne Township's meeting agendas →](https://www.google.com/search?q=Wayne+Township+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$2.9M**

- ~221 roofing squares (assumes 1 story)
- ~55 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [1445 Valley Rd](https://plannednearby.com/x/njp-1614-3103-19) — 0.7 mi · apartments · Wayne Township · filed 2024-12-19
- [Commercial building](https://plannednearby.com/x/njb-1614-24-0015) — 1.2 mi · retail & commercial · Wayne Township · filed 2026-01-15
- [838 Apache Road](https://plannednearby.com/x/njp-0220-2101-14-2) — 2.1 mi · 1 home, single-family homes · Franklin Lakes Borough · filed 2024-09-04
- [711 Cheyenne Drive](https://plannednearby.com/x/njp-0220-1110-08-5) — 2.7 mi · 1 home, single-family homes · Franklin Lakes Borough · filed 2024-11-18
- [Commercial redevelopment project](https://plannednearby.com/x/njb-1614-24-0012) — 2.7 mi · retail & commercial · Wayne Township · filed 2026-09-28
- [548 Goffle Rd](https://plannednearby.com/x/njp-1604-90-1) — 2.8 mi · apartments · Hawthorne Borough · filed 2026-04-16

[See everything nearby on a map →](https://plannednearby.com/near#40.95494,-74.21743,Wayne%20Township)

---

Source page: https://plannednearby.com/x/njb-1614-21-0012

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.