Somerset County · Franklin Township · #1808-19-0012.1
Subdivision creating one new building lot
173 Cedar Grove Ln, Franklin Township, NJ · lot line change
In short: Subdivision creating one new building lot is a lot line change at 173 Cedar Grove Ln in Franklin Township, Somerset County, NJ. As of November 24, 2026, it is permitted (building or site permits issued) according to web research. Latest record: The county record shows NJDEP freshwater wetlands permit 1808-19-0012.1 as issued on 2025-06-16. What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
Subdivision of a property at 173 Cedar Grove Lane in Franklin Township to create one new building lot.
Official description: Subdivision of the property to create one new building lot.
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Subdivision
- Status
- issued
The full picture AI research · Nov 12, 2026
The county records describe a plan to divide the property at 173 Cedar Grove Lane in Franklin Township into two parts, which creates one new lot where a house could be built. Nothing in the records gives the lot size, the owner, or a house design.
The only permit on file is a state freshwater wetlands permit from the NJ Department of Environmental Protection (NJDEP). The application was filed on 2025-01-28 and the permit was issued on 2025-06-16. Wetlands permits are needed when land near streams, swamps or other protected wet areas is going to be disturbed. A permit for this site suggests wetlands are on or near the property.
No developer website, news story, township agenda or minutes, listing, or business page was found for this address. The records don't show whether construction has started.
What it could mean nearby
- The plan adds one building lot, so any effect on traffic, schools and utilities would be small.
- The wetlands permit suggests that protected wet areas on or near the lot may limit where building can happen.
Where it stands
The state wetlands permit was issued on 2025-06-16. No township approval of the subdivision, building permit, or sign of construction was found. After a lot is approved, the owner usually files for building permits, and the township inspects the work as it proceeds.
- Jun 16, 2025 NJDEP freshwater wetlands permit issued
- Jan 28, 2025 Wetlands permit application filed
Around the web
- NJDEP freshwater wetlands permit 1808-19-0012.1New Jersey State Library (DSpace) · Jun 16, 2025Shows the wetlands permit application (2025-01-28) and its issuance (2025-06-16). The page could not be opened directly, so only the summary supplied with the project was used.
Planning terms explained
- Subdivision
- Dividing one property into two or more separate lots that can be sold or built on.
- Lot line change
- Moving the boundary between lots, which can change how land is divided without necessarily making new lots.
- Freshwater wetlands permit
- A state NJDEP permit that regulates building or land disturbance in or near protected wet areas.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 12, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The decision on the subdivision would normally come from the Franklin Township Planning Board, but no hearing notice was found. Residents can ask the township land use office about the application and any hearing dates.
In New Jersey, the Franklin Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Franklin Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →