Union County · Linden City · #2009-26-0001.1 · Warehouses and distribution centers tracker

178,500 SF warehouse and outdoor storage facility

2600 Marshes Dock Rd, Linden City, NJ · 178,500 sq ft non-residential, warehouse & storage

In short: 178,500 SF warehouse and outdoor storage facility is a warehouse and storage development at 2600 Marshes Dock Rd in Linden City, Union County, NJ. It would add 178,500 sq ft of non-residential space. Its estimated construction value is about $23.2M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: NJDEP waterfront development permit 2009-26-0001.1: application filed (July 9, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review NJDEP waterfront development permit 2009-26-0001.1: application filed · Jul 9, 2026 · source
  1. Proposed
  2. In reviewJul 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

Redevelopment of two parcels at 2600 Marshes Dock Road in Linden, with a warehouse of about 178,500 sq ft on the north parcel and outdoor storage on the south parcel, with infrastructure in flood hazard and transition areas.

Official description: Redevelopment of two parcels, including an approximately 178,500 SF warehouse building on the northern parcel and an outdoor storage facility on the southern parcel, with infrastructure in flood hazard and transition areas.

Plan type
State environmental permit application (NJDEP)
Land use
Warehouse & storage
Status
application

Project history

  • 2026-07-09 · #2009-26-0001.1 · State environmental permit application (NJDEP) · 178,500 sq ft
  • 2026-07-09 · NJDEP waterfront development permit 2009-26-0001.1: application filed · source

County plan review office →

The full picture AI research · Nov 18, 2026

The county records describe redevelopment of two parcels at 2600 Marshes Dock Road in Linden. A warehouse of about 178,500 sq ft would go on the north parcel. Outdoor storage would go on the south parcel. Some of the site work would be in flood hazard and transition areas.

The site is not empty. Property records show an 11.5-acre truck-terminal parcel built in 1955, in a FEMA flood zone. Global Partners' public materials describe a bulk liquid energy storage terminal at this address. In 2026 the Linden Planning Board held a hearing on whether the two parcels should be called an "area in need of redevelopment." The outcome was not found.

No developer, tenant, construction news or listing for the warehouse was found. The latest official step is a state waterfront permit application filed July 9, 2026.

What it could mean nearby

Where it stands

The project is under state review: the waterfront development permit application was filed on 2026-07-09. Local redevelopment designation and plan approvals, and then construction permits, usually follow or run alongside, but no source shows they have happened.

Around the web

Planning terms explained
Waterfront development permit
A state permit from NJDEP required for building near tidal waters and shorelines.
Area in need of redevelopment
A legal designation that lets a city adopt a special plan and offer incentives for a site.
Flood hazard area
Land the state expects to flood in a major storm, where building is restricted.
Transition area
A buffer zone next to a protected wetland where building is limited.
Outdoor storage
Using open land to store goods, containers or vehicles rather than keeping them in a building.

Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: NJDEP decides the waterfront permit, and Linden's Planning Board and City Council handle local redevelopment steps. Residents can ask the Linden City Clerk or Planning Board about upcoming meetings.

In New Jersey, the Linden City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Linden City's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $23.2M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →