Atlantic County · Egg Harbor Township · #20250469
6698 Washington Avenue
6698 Washington Avenue, Egg Harbor Township, NJ · 64,499 sq ft non-residential, warehouse & storage
About this project
A new moderate-hazard storage building is proposed at 6698 Washington Avenue in Egg Harbor Township, about 64,499 square feet.
Official description: Storage building, moderate hazard; reported construction cost $6,714,921
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Certificate
Filing history
- 2025-04-09 · #20250469 · Building permit (new construction) · 64,499 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 64,499 square feet is proposed at 6698 Washington Avenue in Egg Harbor Township, Atlantic County. County planning records describe it as a "moderate-hazard" storage building. That is a building-code category for what may be stored inside, and it generally means more fire protection is needed than for ordinary storage.
The records do not say who would use the building, what is on the site now, or whether the township has approved the plan. The latest county filing is dated April 9, 2025.
No news coverage, meeting agendas, developer page or opposition was found for this project. This explanation relies on the county records alone.
What it could mean nearby
- A warehouse of this size usually brings truck and delivery traffic to Washington Avenue and nearby roads. The records give no traffic study or truck count.
- Jobs and the number of workers depend on who occupies the building. That is not known.
Where it stands
The county has a filing from April 2025. No township approval or hearing record was found online. The usual next steps are township board review of the site plan, then construction permits if it is approved.
- Apr 9, 2025 Latest county planning filing for the proposed storage building
Want to weigh in? Site plans are usually decided by the Egg Harbor Township Planning Board at a public meeting. Residents can ask the township about meeting dates and how to comment.
Planning terms explained
- Moderate-hazard storage
- A building-code category for storing materials that burn at a moderate rate, which usually calls for fire-protection measures such as sprinklers.
- Site plan
- A detailed layout showing a building, parking, driveways, drainage and landscaping that a local board reviews before construction.
- Planning board
- A local volunteer board that reviews development applications and decides whether they meet the township's rules.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $8.4M
- ~644 roofing squares (assumes 1 story)
- ~161 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →