Bergen County · River Vale Township · #23-738+A
Business building, Rivervale Rd
Rivervale Rd, River Vale Township, NJ · 23,525 sq ft non-residential, office
About this project
Building permit for new business-use construction of about 23,525 sq ft on Rivervale Rd in River Vale Township, with a reported construction cost of about $11.8 million.
Official description: Business Uses; reported construction cost $11,765,000
- Plan type
- Building permit (new construction)
- Land use
- Business Uses
- Status
- Certificate
Filing history
- 2024-03-26 · #23-738+A · Building permit (new construction) · 23,525 sq ft
The full picture AI research · Nov 1, 2026
The county record describes a building permit for a new business-use (office) building of about 23,525 square feet on Rivervale Road in River Vale Township, Bergen County. The reported construction cost is about $11.8 million. The most recent county filing is dated March 26, 2024.
No news coverage, meeting agenda, or developer page was found that clearly matches this project. The record doesn't say who will build or occupy it, what is on the site now, or whether any neighbors have objected. Other Rivervale Road projects turned up in local news, mostly housing proposals, but none could be tied to this building.
A building permit usually comes after a town has approved the site plan. That suggests the project has cleared the main local land-use review and is moving toward or into construction. The records don't confirm this.
What it could mean nearby
- A building of this size would likely add daily employee and visitor trips on Rivervale Road. No traffic study was found.
- The records give no details on jobs, tenants, parking, or utilities.
Where it stands
A building permit was filed with the county in March 2024, which usually means local land-use approvals are done and construction can start once the permit is issued. Next steps are normally inspections during construction, then a certificate of occupancy.
- Mar 26, 2024 Latest county filing: building permit for new business-use construction
Want to weigh in? The River Vale Joint Planning Board handles land-use applications and meets at Town Hall; residents can check its agendas and minutes or contact the township land use office.
Planning terms explained
- Building permit
- Official permission from the municipality to start construction, issued after plans meet building codes.
- Site plan
- A detailed drawing of how a property will be laid out, including the building, parking, and drainage, that the planning board reviews.
- Certificate of occupancy
- A document issued after final inspections confirming a building is safe to use.
- Variance
- Permission to depart from a zoning rule, such as height or setbacks.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $7.1M
- ~78 roofing squares (assumes 3 stories)
- ~58 tons of cooling (rule of thumb 400 sq ft/ton)