Bergen County · Wallington Borough · #2025-55
52-64 Van Dyke Street
52-64 Van Dyke Street, Wallington Borough, NJ · 61,122 sq ft non-residential, office
About this project
A business-use building of about 61,122 sq ft is planned at 52-64 Van Dyke Street in Wallington Borough, with a reported construction cost of about $2.6 million.
Official description: Business Uses; reported construction cost $2,583,817
- Plan type
- Building permit (new construction)
- Land use
- Business Uses
- Status
- Permit
Filing history
- 2025-05-01 · #2025-55 · Building permit (new construction) · 61,122 sq ft
The full picture AI research · Nov 1, 2026
A business-use (office) building of about 61,122 square feet is proposed at 52-64 Van Dyke Street in Wallington. County records put the construction cost at about $2.6 million. That figure looks low for a building this size, so it may be an early estimate.
Borough planning board minutes from March 2023 show an application for this address. The applicant was 52 Van Dyke LLC, and it sought site plan approval with variances and waivers. The lot is about 1.2 acres. It sits near Jordan Avenue and the NJ Transit rail line, with an industrial property to the south. That is one search summary's reading of the minutes. The document itself could not be opened. The summary did not say what the board decided, who will occupy the building, or whether anyone opposed it.
What it could mean nearby
- Traffic and parking could change on Van Dyke Street and Jordan Avenue. No traffic study was found.
- An office or business use could bring daytime jobs and visitors to an area that already has industrial and rail uses.
Where it stands
A county filing was recorded on 2025-05-01. The borough's 2023 board hearing outcome could not be confirmed, so the current approval status is unclear. Usual next steps are board approval of the site plan, then construction permits and inspections.
- May 1, 2025 Latest county planning filing for the project
- Mar 21, 2023 Wallington Planning Board minutes record a site plan application by 52 Van Dyke LLC for this address
Want to weigh in? The Wallington Planning Board reviews site plans and variances, and residents can comment at its public meetings. Agendas are posted on the borough website.
Who's behind it
52 Van Dyke LLC · This is the applicant named in borough planning board minutes. No company website or information on its other projects was found.
Planning terms explained
- Site plan approval
- The board's review of a development's layout, including the building, parking, drainage and access.
- Variance
- Permission to depart from a local zoning rule, such as a size, height or parking requirement.
- Waiver
- An exemption from a specific submission or design requirement in the site plan rules.
- Block and lot
- The borough tax-map numbers that identify a parcel of land.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $18.3M
- ~203 roofing squares (assumes 3 stories)
- ~152 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →