Bergen County · Washington Township · #24-442

95 Linwood Ave

95 Linwood Ave, Washington Township, NJ · 10,500 sq ft non-residential, institutional

About this project

A building permit for new construction at 95 Linwood Avenue in Washington Township for an adult and child day care serving six or more occupants. The building is about 10,500 square feet, with a reported construction cost of $917,650.

Official description: Institutional Adult/Child Day Care for 6+ Occupants; Single-Family Detached; reported construction cost $917,650

Plan type
Building permit (new construction)
Land use
Single-Family Detached
Status
Certificate

Filing history

  • 2024-11-15 · #24-442 · Building permit (new construction) · 10,500 sq ft
  • 2024-10-23 · #24-410 · Building permit (new construction) · 10,500 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The county record describes a new one-story building of about 10,500 square feet at 95 Linwood Avenue. It would be a child day care and preschool, with a reported construction cost of about $918,000. Local news coverage links the site to Apple Montessori School.

The lot is about 1.5 acres and was formerly a steakhouse restaurant, and before that a gas station. It sits in a zone meant for single-family homes. The township looked at buying it for a public works or police facility, then dropped the idea over public opposition and contamination questions.

The school first proposed a two-story building of about 18,700 square feet for up to 154 children. The zoning board approved that plan in March 2023. A revised, smaller one-story plan of about 10,470 square feet was then put forward, which matches the county record. No coverage of the outcome of the revised plan was found.

What it could mean nearby

Where it stands

The zoning board approved the original plan in March 2023, and the amended plan was scheduled for a hearing in July 2023. A building permit was filed with the county in November 2024, which suggests the project reached the construction stage. The current construction status was not confirmed.

Want to weigh in? The township zoning board of adjustment decided the use variance and holds public hearings. Residents can comment at its meetings, and any further approvals would go through the township's land-use boards.

Who's behind it

Apple Montessori Schools · A private Montessori preschool and child care operator, named in local news as the applicant for this site.

Around the web

Planning terms explained
Use variance
Special permission to use land in a way the zoning does not normally allow, such as a school in a single-family zone.
Zoning Board of Adjustment
A local board that decides requests to depart from zoning rules.
Inherently beneficial use
A use, such as a child care center, that state law treats as serving the public good, which makes a use variance easier to justify.
Site plan
A detailed drawing showing the building, parking, driveways, drainage and landscaping on a lot.
Impervious coverage
The share of a lot covered by pavement or buildings that rainwater cannot soak through.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →