Burlington County · Bordentown Township · #20250244U
Storage building at 399 Route 130
399 Route 130, Bordentown Township, NJ · 104,076 sq ft non-residential, warehouse & storage
About this project
A moderate-hazard storage building of about 104,076 square feet at 399 Route 130 in Bordentown Township, Burlington County. The reported construction cost is $230,000.
Official description: Storage building, moderate hazard; reported construction cost $230,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2026-02-02 · #20250244U · Building permit (new construction) · 104,076 sq ft
- 2025-07-02 · #20250244 · Building permit (new construction) · 104,030 sq ft
The full picture AI research · Nov 1, 2026
A storage building of about 104,076 square feet is proposed at 399 Route 130 in Bordentown Township, Burlington County. County records classify it as a warehouse and storage use with a moderate fire-hazard rating. The reported construction cost is $230,000. That figure looks low for a building this large, so it may cover only part of the work.
The county's latest filing is dated February 2, 2026. The records don't say what is on the site now or who will use the building.
No news coverage, township agendas, developer pages or permits were found for this address. Other warehouse proposals along Route 130 in Bordentown have been reported, but none could be tied to this site.
What it could mean nearby
- A building of this size could bring more truck and delivery traffic on Route 130, but no traffic study was found.
- Job numbers, utility needs and school effects are not stated in the records.
Where it stands
The county has a filing on record from February 2026. No township approval status was found online. Projects like this usually go through township planning or zoning review and then construction permits.
- Feb 2, 2026 Latest filing in the county planning records
Want to weigh in? Residents can ask the Bordentown Township planning office whether the project is on a Planning Board agenda. Public comment usually happens at the hearing.
Planning terms explained
- Site plan
- A detailed drawing of a project's building, parking, drainage and driveways that the township reviews before approving construction.
- Moderate-hazard storage
- A fire-code category for buildings holding goods that burn fairly quickly, such as many ordinary stored products.
- Non-residential square footage
- The total floor area of the building that is not used for housing.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $13.5M
- ~1,040 roofing squares (assumes 1 story)
- ~260 tons of cooling (rule of thumb 400 sq ft/ton)