Burlington County · Cinnaminson Township · #25-00487+D
2101 Rte 130 storage building
2101 Rte 130, Cinnaminson Township, NJ · 17,227 sq ft non-residential, warehouse & storage
About this project
A moderate-hazard storage building of about 17,200 sq ft is proposed at 2101 Rte 130 in Cinnaminson Township.
Official description: Storage building, moderate hazard; reported construction cost $650,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2025-10-16 · #25-00487+D · Building permit (new construction) · 17,227 sq ft
- 2025-08-20 · #25-00487 · Building permit (new construction) · 17,227 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 17,200 square feet is proposed at 2101 Route 130 in Cinnaminson Township. That is roughly the footprint of a large retail store. County records classify it as a moderate-hazard storage building. That is a fire-safety category for buildings that hold goods that burn at a moderate rate.
No news coverage, township agenda, minutes or developer page was found for this specific proposal. Online business listings show that a self-storage and truck-rental business already operates at this address. The records do not say whether the new building would be an addition to that business, so that link is unconfirmed. The records also do not say who would use the building.
What it could mean nearby
- Route 130 is a major commercial highway, so any added traffic would likely use existing business driveways. No traffic study was found.
- A storage building typically brings few permanent jobs and no new homes or school children.
- The records do not mention changes to open space or utilities.
Where it stands
The county's latest filing is dated 2025-10-16, so the proposal has reached county review. Township board approvals, such as site plan approval, usually come around that time, but no township decision was found online.
- Oct 16, 2025 Latest county planning filing for the storage building
Want to weigh in? Site plans like this are usually decided by the Cinnaminson Township Planning Board at a public meeting. Residents can check the township website for agendas or ask the township clerk.
Planning terms explained
- Site plan approval
- A township board's review of a project's layout, including the building, parking, drainage and driveways.
- Moderate-hazard storage
- A building-code category for storing materials that burn at a moderate rate, which sets fire-protection requirements.
- Planning Board
- A volunteer township body that reviews development applications at public meetings.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.2M
- ~172 roofing squares (assumes 1 story)
- ~43 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →