Burlington County · Mount Laurel Township · #25CP2299
912 Rt 73 business building
912 Rt 73, Mount Laurel Township, NJ · 24,745 sq ft non-residential, office
About this project
Business building of about 24,745 sq ft at 912 Route 73 in Mount Laurel Township, with a reported construction cost of about $2.3 million.
Official description: Business Uses; reported construction cost $2,328,960
- Plan type
- Building permit (new construction)
- Land use
- Business Uses
- Status
- Permit
Filing history
- 2026-02-13 · #25CP2299 · Building permit (new construction) · 24,745 sq ft
The full picture AI research · Nov 1, 2026
County records show a proposed business (office) building of about 24,745 square feet at 912 Route 73 in Mount Laurel Township. The reported construction cost is about $2.3 million. The latest county filing is dated February 13, 2026.
No developer website, news story, township agenda or hearing notice was found that clearly describes this office project. The records do not say who would occupy the building, what is on the site now, or whether anyone has objected.
One 2023 news item mentioned a different proposal, a car wash, at the same street address. It is not clearly the same project, so it is not used here.
What it could mean nearby
- Route 73 is a busy state highway, so new office space could add daily car trips. No traffic study was found for this project.
- An office building of this size would likely bring some jobs. The number is not known.
Where it stands
The county filing from February 2026 shows the project has reached county planning review. Typically the township planning board or zoning board then hears the application at a public meeting, and building permits follow once approvals are granted. The township's decision status was not found online.
- Feb 13, 2026 Latest filing in county planning records
Want to weigh in? The Mount Laurel Township planning board or zoning board usually decides site plan applications at public meetings, and residents can comment there. Agendas are posted by the township.
Planning terms explained
- Site plan
- A detailed drawing showing the building, parking, driveways, drainage and landscaping that a board reviews before approving construction.
- Bulk variance
- Permission to depart from zoning rules on size, setbacks or lot coverage.
- Planning board
- A local public body that reviews development applications and holds public hearings.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $7.4M
- ~82 roofing squares (assumes 3 stories)
- ~61 tons of cooling (rule of thumb 400 sq ft/ton)