PlannedNearby

Camden County · Pennsauken Township · #020231839+A

225 Griffith Morgan Ln

225 Griffith Morgan Ln, Pennsauken Township, NJ · 19,669 sq ft non-residential, industrial

About this project

A new-construction building permit covers a 19,669 sq ft factory and industrial building at 225 Griffith Morgan Ln in Pennsauken Township, Camden County.

Official description: Factory and industrial, moderate hazard; reported construction cost $359,069

Plan type
Building permit (new construction)
Land use
Factory and industrial, moderate hazard
Status
Permit

Filing history

  • 2024-07-10 · #020231839+A · Building permit (new construction) · 19,669 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records show a building permit for a new 19,669 sq ft factory and industrial building at 225 Griffith Morgan Ln in Pennsauken Township. Records filed through July 2024 do not say who will use it.

A 2023 township planning board agenda lists the same address as the site of a proposed water treatment facility. The agenda ties it to the Camden-area water utility's Morris-Delair treatment plant, in the well field next to the plant. The stated aim was to remove PFAS and 1,4-dioxane, which are contaminants, from drinking water. Another listing gave a slightly different size of about 20,660 sq ft. The county permit may therefore be for this treatment building, but that match is likely rather than confirmed. The agenda page could not be opened directly, so these details come from a search summary of it.

No news coverage, opposition, or developer website was found.

What it could mean nearby

Where it stands

A building permit has been filed with the county, and the project appears to have been before the township planning board in 2023. Construction normally follows once permits and any remaining approvals are in place, and the township building inspectors then check the work.

Want to weigh in? Pennsauken Township's planning board handles site plans at public meetings. Agendas and meeting notices are posted on the township website, pennsauken.gov.

Planning terms explained
Site plan
A detailed drawing and review showing how a property will be laid out, including buildings, parking, drainage and access.
Building permit
Official permission to construct a building, issued after the plans meet code.
Planning board
A township body that reviews development applications at public meetings.
PFAS
A group of long-lasting man-made chemicals that can contaminate drinking water.
Zoning (HI)
The township rule that sets which uses are allowed on a lot. HI appears to mean heavy industrial.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.