Camden County · Waterford Township · #020260019
Storage building, Waterford Township
C William Haines Blvd, Waterford Township, NJ · 267,389 sq ft non-residential, warehouse & storage
About this project
A new storage building on a road in Waterford Township, Camden County, with about 267,389 sq ft of floor area.
Official description: Storage building, moderate hazard; Other Non-Residential; reported construction cost $8,021,670
- Plan type
- Building permit (new construction)
- Land use
- Other Non-Residential
- Status
- Permit
Filing history
- 2026-01-16 · #020260019 · Building permit (new construction) · 267,389 sq ft
The full picture AI research · Nov 1, 2026
A new warehouse of about 267,389 square feet is proposed on C William Haines Boulevard in the Atco section of Waterford Township. Local coverage describes a roughly 300-by-890-foot building with a 40-foot clear interior height and 48 loading docks. It sits across from the NJ Transit Atco rail station, close to Route 73.
The site is part of the Haines Boulevard Redevelopment Area. A news report described a 53-acre property that includes the former Atco movie theater and drive-in land. A second building was approved for the same property, but it was reported as not yet under development.
Coverage names PNK Group as the developer. Trade reports said construction started in late 2025, with completion expected in the third quarter of 2026. No source found confirms that it is finished or who will occupy it. No organized opposition turned up.
What it could mean nearby
- Truck traffic is likely on Haines Boulevard and nearby Routes 73 and 30, because the building has 48 loading docks.
- The site is next to a rail station, and the redevelopment plan was meant to encourage growth there.
- Warehouse operations usually bring jobs, but no source gave a job count.
- The property is a former movie theater and drive-in site, so it is a redevelopment of previously used land.
Where it stands
Trade reports say the project is approved and construction began in late 2025. No township approval records were found online. After construction, the usual steps are final inspections and a certificate of occupancy before a tenant moves in.
- Jan 16, 2026 Latest county planning filing for the project
- Oct 2025 Trade press reported that construction had started
- Oct 2016 Pinelands Commission staff discussed the township's Haines Boulevard Redevelopment Plan
Want to weigh in? Waterford Township's planning board and governing body handle local land-use matters. Residents can check the township website for meeting notices and public comment times.
Who's behind it
PNK Group · A New York-based real estate company that coverage links to this warehouse. No official company site was confirmed, and this research found no details on its other projects.
Around the web
- Atco 268,000 SF warehouse under development, 2nd approved for movie property42freeway.comReports the warehouse is under development and a second building is approved for the former movie property.
- 268,000 sq ft Atco warehouse under developmentHammonton GazetteLocal coverage of the warehouse under development in Atco.
- Pinelands Commission Policy & Implementation Committee minutes, October 2016NJ Pinelands Commission · Oct 25, 2016Records the township's presentation of its Haines Boulevard Redevelopment Plan.
Planning terms explained
- Redevelopment area
- An area the township has formally designated for rebuilding or reuse under a special plan with its own rules.
- Pinelands Commission
- The state agency that oversees land use in the protected New Jersey Pinelands region and reviews some local plans.
- Clear height
- The usable height inside a warehouse from the floor to the lowest overhead obstruction.
- Loading dock
- A raised bay where trucks back up to load and unload goods.
- Certificate of occupancy
- The township's approval that a finished building is safe to use.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $34.8M
- ~2,673 roofing squares (assumes 1 story)
- ~668 tons of cooling (rule of thumb 400 sq ft/ton)