Cape May County · Dennis Township · #20260044
1910 Route 9 storage building
1910 Rt 9, Dennis Township, NJ · 24,000 sq ft non-residential, warehouse & storage
About this project
A new moderate-hazard storage building of about 24,000 sq ft at 1910 Route 9 in Dennis Township, under a building permit.
Official description: Storage building, moderate hazard; reported construction cost $919,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2026-03-09 · #20260044 · Building permit (new construction) · 24,000 sq ft
- 2026-03-09 · #20260043 · Building permit (new construction) · 24,000 sq ft
- 2026-03-09 · #20260042 · Building permit (new construction) · 24,000 sq ft
- 2026-03-09 · #20260041 · Building permit (new construction) · 24,000 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 24,000 square feet is proposed at 1910 Route 9 in Dennis Township, Cape May County. County records describe it as a "moderate-hazard" storage building, a fire-code category for buildings that hold materials burning at a moderate rate. The county's most recent filing on it is dated March 2026, and it is listed under a building permit.
The records do not say what is on the site now, who will use the building, or what will be stored in it. No news coverage, township meeting records, or developer page specific to this project turned up in online searches, so this explanation relies on the county facts alone.
What it could mean nearby
- Route 9 is a main road through the township. Traffic from trucks and deliveries is possible, but no traffic study was found.
- The records give no job counts, housing, or school effects.
Where it stands
The county lists the project under a building permit, which usually means the main land-use review is finished or was not required. Next steps are normally construction inspections and, once the building is finished, a certificate of occupancy.
- Mar 9, 2026 Latest filing in the county planning records
Want to weigh in? No public hearing was found. Questions can go to the Dennis Township construction or zoning office, and the township planning board meets in public if the project returns for review.
Planning terms explained
- Building permit
- Official permission from the local construction office to build a structure that meets the building code.
- Moderate-hazard storage
- A fire-code category for buildings that store materials that burn at a moderate rate.
- Certificate of occupancy
- A document issued after final inspection confirming that a building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.1M
- ~240 roofing squares (assumes 1 story)
- ~60 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →