PlannedNearby

Cape May County · Upper Township · #26-00261

442 Rt US 9 South

442 Rt Us 9 So, Upper Township, NJ · 10,160 sq ft non-residential, warehouse & storage

About this project

A new low-hazard storage building of about 10,160 sq ft at 442 US Route 9 South in Upper Township.

Official description: Storage building, low hazard; reported construction cost $453,040

Plan type
Building permit (new construction)
Land use
Storage building, low hazard
Status
Permit

Filing history

  • 2026-06-18 · #26-00261 · Building permit (new construction) · 10,160 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The county record describes a new, low-hazard storage building of about 10,160 square feet at 442 US Route 9 South in Marmora, Upper Township. Low-hazard means the building is meant to hold ordinary goods, not dangerous materials.

The county record does not say who would use the building or what is on the site today. A January 2025 news report covered a garden center proposal at 442-444 Route 9 South. That site is about 9.4 acres and holds two homes. The township zoning board approved a use variance and site plan for a garden center with a 4,900-square-foot office/retail building, a greenhouse and an outdoor storage area. That report does not mention a separate 10,160-square-foot storage building. It is not confirmed that the county filing is part of that plan.

What it could mean nearby

Where it stands

The county record shows a filing dated June 18, 2026. No township approval of this storage building was found. The earlier garden center plan was approved in January 2025. A new building usually needs township land-use board review or a plan amendment, then construction permits.

Want to weigh in? Upper Township's land-use boards decide local site plan questions, and residents can usually comment at their public meetings. Check the township's posted agendas for dates.

Around the web

Planning terms explained
Use variance
Permission to use land in a way the zoning rules do not normally allow.
Site plan approval
Board approval of a project's layout, including buildings, parking, driveways and drainage.
Setback
The required distance between a building and a property line or road.
Stormwater basin
A constructed area that collects and slows rain runoff from paved and roofed surfaces.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $1.3M