PlannedNearby

Cumberland County · Upper Deerfield Township · #24-218+A

1274 and 1276 Highway 77 storage building

1274 + 1276 Highway 77, Upper Deerfield Township, NJ · 24,000 sq ft non-residential, warehouse & storage

About this project

A new moderate-hazard storage building of about 24,000 sq ft at 1274 and 1276 Highway 77 in Upper Deerfield Township. The reported construction cost is about $1.9 million.

Official description: Storage building, moderate hazard; reported construction cost $1,858,941

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2024-07-24 · #24-218+A · Building permit (new construction) · 24,000 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records describe a new storage building of about 24,000 square feet at 1274 and 1276 Highway 77 in Upper Deerfield Township, Cumberland County. It is classed as a moderate-hazard storage building, which means the stored goods carry a middling fire risk. The reported construction cost is about $1.9 million.

The records do not say what is on the site now, who will use the building, or who is building it. A web search found no news coverage, developer page or township decision that clearly matches this project. The township planning board has handled other warehouse and industrial projects along Highway 77, but none could be confirmed as this one. This explanation therefore rests on the county facts alone.

What it could mean nearby

Where it stands

The most recent county filing is dated July 24, 2024. No approval or hearing result for this project was found online. Projects like this usually go next to the township planning board for site plan review, then to construction permits.

Want to weigh in? Site plan applications in Upper Deerfield Township are normally decided by the township planning board at public meetings. Residents can check the township's posted agendas for a hearing notice and comment there.

Planning terms explained
Site plan
A detailed layout showing a building, parking, driveways, drainage and landscaping that the township reviews before construction.
Moderate-hazard storage
A building code category for storing materials that burn at a moderate rate, which sets fire protection requirements.
Planning board
The local volunteer board that reviews development applications and holds public hearings.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.1M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →