Essex County · Cedar Grove Township · #24-0249
12 Old Bridge Road
12 Old Bridge Road, Cedar Grove Township, NJ · 32,601 sq ft non-residential, industrial
About this project
A new industrial factory building of about 32,601 square feet at 12 Old Bridge Road in Cedar Grove Township, Essex County.
Official description: Factory and industrial, moderate hazard; reported construction cost $2,973,345
- Plan type
- Building permit (new construction)
- Land use
- Factory and industrial, moderate hazard
- Status
- Permit
Filing history
- 2024-05-29 · #24-0249 · Building permit (new construction) · 32,601 sq ft
The full picture AI research · Nov 1, 2026
County records describe a proposal for a new industrial factory building of about 32,601 square feet at 12 Old Bridge Road in Cedar Grove Township, Essex County. That is roughly the footprint of several large retail stores.
The records don't say what the site is used for now. They also don't name the user of the building or what it would make. The most recent county filing is dated May 29, 2024.
A web search found no news coverage, township agendas or minutes, hearing notices, developer pages or permits about this address. Nothing is known online about opposition, approvals or a tenant. This explanation rests only on the county records.
What it could mean nearby
- Industrial buildings can bring truck and delivery traffic. The records give no details on access or driveways for this site.
- A factory could bring jobs. The records don't say how many.
- Utility, stormwater and school effects can't be judged from the records available.
Where it stands
The county has a filing on record from May 2024, but no township approval or hearing was found online. Projects like this usually go to the local planning board for site plan review. Neighbors are normally notified of any public hearing.
- May 29, 2024 Latest filing for the project in county planning records
Want to weigh in? The Cedar Grove Township planning or zoning board would typically decide, and residents can usually comment at its public hearing. Contact the township clerk or land use office for meeting dates.
Planning terms explained
- Site plan review
- A local board's check of a project's layout, including parking, drainage, traffic flow and landscaping, before it can be built.
- Industrial use
- A land use for manufacturing, production, or similar work, usually allowed only in zones set aside for it.
- Non-residential square footage
- The total floor area of the building that is not housing.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.2M
- ~326 roofing squares (assumes 1 story)
- ~81 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →