Essex County · Millburn Township · #26-0415
Accessory structures, Block 5302 Lot 5.01
Millburn Township, NJ · 22,209 sq ft non-residential, other
About this project
New accessory buildings and miscellaneous structures totaling about 22,209 sq ft on Block 5302, Lot 5.01 in Millburn Township, with a reported construction cost of about $5 million.
Official description: Accessory buildings and miscellaneous structures; reported construction cost $5,000,000
- Plan type
- Building permit (new construction)
- Land use
- Accessory buildings and miscellaneous structures
- Status
- Permit
Filing history
- 2026-04-13 · #26-0415 · Building permit (new construction) · 22,209 sq ft
The full picture AI research · Nov 1, 2026
The county records describe new accessory buildings and other miscellaneous structures on Block 5302, Lot 5.01 in Millburn Township, Essex County. Together they total about 22,209 square feet of non-residential space. The reported construction cost is about $5 million.
"Accessory" means the buildings support a main use on the property. They are not the main building. Examples are storage, maintenance, recreation or service buildings. The records do not say what these structures are for or who will use them. They also do not say what is on the site now or who is building them.
No news coverage, meeting agendas, developer page or permit documents clearly tied to this lot were found online. The details above come from the county filing alone.
What it could mean nearby
- The records do not say how the project would affect traffic, access, schools or utilities.
- The project is non-residential, so it does not appear to add homes.
- With about $5 million in construction, some temporary construction jobs are likely, but no figures are available.
Where it stands
The latest county filing is dated 2026-04-13. No local approval status could be confirmed. Projects like this usually need a township zoning or building review, then construction permits, before work starts.
- Apr 13, 2026 Latest county planning filing for the project
Want to weigh in? The Millburn Township Planning Board or Zoning Board of Adjustment would likely handle any required hearing. Residents can usually comment at public meetings listed on the township website. This project's hearing schedule could not be confirmed.
Planning terms explained
- Accessory structure
- A secondary building or structure that supports the main use of a property, such as a shed, pavilion or storage building.
- Block and Lot
- The numbers that identify a parcel in the township's tax map.
- Non-residential square footage
- Floor area built for uses other than housing, such as commercial, recreational or institutional uses.
- Site plan approval
- A local board's review of a project's layout, access, drainage and other site features.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.4M
- ~222 roofing squares (assumes 1 story)
- ~55 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →