Gloucester County · Elk Township · #020240156
Storage building at 125 Buck Rd
125 Buck Rd, Elk Township, NJ · 90,000 sq ft non-residential, warehouse & storage
About this project
A 90,000 sq ft storage building is permitted at 125 Buck Road in Elk Township, Gloucester County, NJ, with a reported construction cost of about $4.3 million.
Official description: Storage building, low hazard; Other Non-Residential; reported construction cost $4,333,875
- Plan type
- Building permit (new construction)
- Land use
- Other Non-Residential
- Status
- Permit
Filing history
- 2024-07-03 · #020240156 · Building permit (new construction) · 90,000 sq ft
The full picture AI research · Nov 1, 2026
A 90,000-square-foot storage building is permitted at 125 Buck Road in Elk Township, Gloucester County. The county lists its reported construction cost at about $4.3 million. The latest county filing is dated July 3, 2024.
Township planning board minutes from August 2023 appear to show approval for this address. The approval went to a company called Adelante Partners, LLC. It covered a conditional use and a combined preliminary and final site plan for Block 72, Lot 4. The search summary of those minutes did not say what the building is for or how large it is. The minutes page could not be opened directly to confirm the details.
The site was recorded as vacant land of about 12.7 acres in an online parcel listing. No news coverage, opposition or named tenant was found.
What it could mean nearby
- Truck and delivery traffic on Buck Road could increase, but no traffic study was found.
- Building a large structure on a roughly 12-acre vacant parcel would reduce open land.
- Storage and warehouse uses usually bring few permanent jobs and no new homes or school students.
Where it stands
The township planning and zoning board appears to have granted site plan approval in August 2023, and a building permit was later recorded by the county. Construction and inspections usually come next.
- Jul 3, 2024 Latest county filing for the 90,000 sq ft storage building
- Aug 16, 2023 Planning and zoning board minutes record a resolution approving a conditional use and site plan at 125 Buck Road (SP 23-01)
Want to weigh in? The Elk Township Combined Planning and Zoning Board handled the approval. Residents can ask the township about any further applications or hearings.
Who's behind it
Adelante Partners, LLC · The company is named in township minutes as the applicant for this site. No company website or other projects were found.
Around the web
- 125 BUCK RDNJ ParcelsThis parcel listing shows Block 72, Lot 4 as about 12.7 acres of land.
Planning terms explained
- Conditional use
- A use the zoning allows only if the project meets extra standards set by the township.
- Site plan
- A detailed layout showing the building, parking, drainage and access for a property.
- Preliminary and final approval
- A board decision that covers both review stages at once, so the project can move to permits.
- Resolution
- The board's formal written record of its decision.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $11.7M
- ~900 roofing squares (assumes 1 story)
- ~225 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →