Gloucester County · Mantua Township · #225000335
Bridgeton Pk
Bridgeton Pk, Mantua Township, NJ · 21,930 sq ft non-residential, retail & commercial
About this project
A business building of about 21,930 sq ft for stores and customer service is proposed on Bridgeton Pk in Mantua Township, with a reported construction cost of $1.56 million.
Official description: Business Uses; Stores & Customer Service; reported construction cost $1,558,450
- Plan type
- Building permit (new construction)
- Land use
- Stores & Customer Service
- Status
- Permit
Filing history
- 2025-06-10 · #225000335 · Building permit (new construction) · 21,930 sq ft
The full picture AI research · Nov 1, 2026
A one-story business building of about 21,930 square feet is proposed on Bridgeton Pike in Mantua Township, Gloucester County. The county describes it as space for stores and customer service. The reported construction cost is $1.56 million.
The county filing was dated June 10, 2025. The records do not say what is on the site now, who will occupy the building, or who is building it.
No news coverage, developer page, or township hearing notice could be clearly tied to this project. The township posts a record titled "450 Bridgeton Pike – Major Site Plan-Use Variance." It could not be confirmed as the same project, so it is not relied on here.
What it could mean nearby
- Traffic: a retail building of this size usually brings more customer trips and driveway turning movements on Bridgeton Pike. No traffic study was found.
- Jobs: stores and customer service space typically add some retail jobs. The number is unknown.
- Utilities and open space: no information was found on either.
Where it stands
The county has a filing from June 2025. No local approval or hearing outcome could be confirmed online. A project like this normally needs township land use board review of its site plan, and sometimes a variance. Construction permits follow approval.
- Jun 10, 2025 Latest county planning filing for the project
Want to weigh in? The Mantua Township land use board normally decides site plans and variances, and the public can comment at its meetings. Agendas are posted on the township website.
Planning terms explained
- Site plan
- A detailed layout showing a building, parking, driveways, drainage and landscaping, which the township reviews before approving construction.
- Use variance
- Permission to use land in a way the zoning rules do not normally allow.
- Land use board
- The township body that reviews development applications and holds public hearings on them.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.8M
- ~219 roofing squares (assumes 1 story)
- ~54 tons of cooling (rule of thumb 400 sq ft/ton)