Hudson County · Kearny Town · #20240183+A
682-686 Schuyler Ave
682-686 Schuyler Ave, Kearny Town, NJ · 71,020 sq ft non-residential, warehouse & storage
About this project
A moderate-hazard storage building of about 71,020 sq ft is proposed at 682-686 Schuyler Ave in Kearny, with a reported construction cost of $10 million.
Official description: Storage building, moderate hazard; reported construction cost $10,000,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Certificate
Filing history
- 2025-06-06 · #20240183+A · Building permit (new construction) · 71,020 sq ft
- 2024-04-04 · #20240183 · Building permit (new construction) · 71,020 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 71,020 square feet is proposed at 682-686 Schuyler Ave in Kearny, Hudson County. County records describe it as a warehouse and storage use in a "moderate-hazard" category. That is a building-code label for the fire risk of what is stored, and it does not point to anything unusual. The reported construction cost is $10 million.
The county records do not say what is on the site now. They do not say who will use the building or how many floors it will have. The latest county filing is dated June 6, 2025.
No news coverage, meeting agendas, developer pages or approval records were found for this address. This explanation therefore rests on the county facts alone.
What it could mean nearby
- Warehouses usually bring truck and delivery traffic. No traffic study for this site was found, so the actual effect is unknown.
- A building of this size would likely create some jobs, but the records give no staffing figures.
- The records do not mention new homes, open space or schools.
Where it stands
The county has a filing on record from June 2025. No local approval status could be confirmed online. Projects like this usually go through a local site plan review and construction permits before work begins.
- Jun 6, 2025 Latest county planning filing for the project
Want to weigh in? Site plan applications in Kearny are usually decided by the town's planning board, which holds public meetings. Residents can check the town's website for agendas and comment times.
Planning terms explained
- Moderate-hazard storage
- A building-code category for storage of materials that burn at a moderate rate, which sets fire-safety requirements for the building.
- Site plan review
- A local board's review of a project's layout, including parking, driveways, drainage and landscaping.
- Non-residential square footage
- The total floor area of the building that is not used for housing.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $9.2M
- ~710 roofing squares (assumes 1 story)
- ~177 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →