PlannedNearby

Mercer County · Robbinsville Township · #20250422

Storage building on Block 1, Lot 49.01

Robbinsville Township, NJ · 59,600 sq ft non-residential, warehouse & storage

About this project

A new moderate-hazard storage building of about 59,600 sq ft on Block 1, Lot 49.01 in Robbinsville Township, reported at $1.85 million.

Official description: Storage building, moderate hazard; reported construction cost $1,850,000

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Certificate

Filing history

  • 2025-05-28 · #20250422 · Building permit (new construction) · 59,600 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A new storage building of about 59,600 square feet is proposed on Block 1, Lot 49.01 in Robbinsville Township, Mercer County. The county's planning records list it as a "moderate-hazard" storage use, a building-code category for the kinds of goods kept inside. The reported cost is $1.85 million.

The county records do not say what is on the lot now, who will use the building, or what the street address is. Searches found no news coverage, township agendas or minutes, developer page, or reports of opposition or approvals for this lot. Block 1 is along the Route 130 corridor, but that does not confirm where this lot is.

What it could mean nearby

Where it stands

The county logged a filing on 2025-05-28. No township approval status was found online. Projects like this usually need local planning board site plan review, then permits and construction.

Want to weigh in? The Robbinsville Township planning board usually reviews site plans of this kind. Residents can check its agendas and attend its public meetings to comment.

Planning terms explained
Block and Lot
The tax-map numbers used to identify a specific parcel of land.
Site plan review
A local board's check of a project's layout, parking, drainage and access before it can be built.
Moderate-hazard storage
A building-code category for storage of materials that are moderately combustible.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $7.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →