PlannedNearby

Mercer County · Robbinsville Township · #20250235

Block 41.01, Lot 31.01

Robbinsville Township, NJ · 349,755 sq ft non-residential, warehouse & storage

About this project

New moderate-hazard storage building of about 349,755 square feet on Block 41.01, Lot 31.01 in Robbinsville Township. The reported construction cost is about $5 million.

Official description: Storage building, moderate hazard; reported construction cost $4,986,999

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2025-03-13 · #20250235 · Building permit (new construction) · 349,755 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A new storage building of about 349,755 square feet is proposed on Block 41.01, Lot 31.01 in Robbinsville Township, Mercer County. That is roughly the footprint of six American football fields. County records classify it as a moderate-hazard storage building, which is a fire-safety category for the kinds of goods stored. They list a reported construction cost of about $5 million.

The county filing is dated March 13, 2025. The records do not say what is on the lot now. They also do not name the developer or a future occupant.

No news coverage, township agenda or minutes, developer page, or state permit was found that clearly refers to this lot. Other warehouse projects in Robbinsville turned up in searches. None could be tied to this block and lot, so none are used here.

What it could mean nearby

Where it stands

The county filed the project on 2025-03-13. No township hearing, approval or construction notice could be linked to it online. Such projects usually go to the township land use board for site plan review, followed by construction permits.

Want to weigh in? Robbinsville Township's land use board normally reviews site plans at public meetings, and residents can usually comment there. Check the township's posted agendas for this lot.

Planning terms explained
Block and Lot
The numbers the township tax map uses to identify one specific parcel of land.
Site plan review
A local board's check of a building's layout, parking, drainage and traffic access before it is approved.
Moderate-hazard storage
A building-code category for storing goods that burn at a moderate rate, which sets fire-safety requirements.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $45.5M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →