Middlesex County · Monroe Township · #20253384+A
Storage building, Monroe Township
Monroe Township, NJ · 37,737 sq ft non-residential, warehouse & storage
About this project
A new moderate-hazard storage building of about 37,737 sq ft is proposed on Block 55.1, Lot 8 in Monroe Township, with a reported construction cost of about $4.5 million.
Official description: Storage building, moderate hazard; reported construction cost $4,480,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2026-01-14 · #20253384+A · Building permit (new construction) · 37,737 sq ft
The full picture AI research · Nov 1, 2026
County records show a proposal for a new storage building of about 37,737 square feet on Block 55.1, Lot 8 in Monroe Township, Middlesex County. The county lists it as a moderate-hazard storage use, which generally means it would hold goods that burn at a moderate rate. The reported construction cost is about $4.5 million.
The county's latest filing is dated January 14, 2026. The records do not say what is on the site now, who the developer is, or who would use the building.
No project-specific news coverage, township agenda or minutes, developer page, or press release was found that clearly matches this block and lot. The explanation here relies on the county facts alone.
What it could mean nearby
- Traffic and truck activity would depend on how the building is used. The records do not say.
- Jobs and utility needs are not stated in the available records.
Where it stands
A filing with the county was recorded on 2026-01-14. Local site plan review and construction permits usually come next, if they are not already done. The records do not say which approvals have been granted.
- Jan 14, 2026 Latest county filing for the storage building
Want to weigh in? Warehouse and storage projects like this are usually reviewed by the Monroe Township Planning Board at public meetings. Residents can ask the township to confirm whether this application is on an agenda.
Planning terms explained
- Block and Lot
- The tax-map numbers that identify one parcel of land.
- Site plan review
- A local board's review of a building's layout, parking, drainage and access before approval.
- Moderate-hazard storage
- A fire-code category for buildings storing goods that burn at a moderate rate.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.9M
- ~377 roofing squares (assumes 1 story)
- ~94 tons of cooling (rule of thumb 400 sq ft/ton)