PlannedNearby

Middlesex County · Piscataway Township · #20261120

Storage building, Piscataway Township

Piscataway Township, NJ · 125,101 sq ft non-residential, warehouse & storage

About this project

New moderate-hazard storage building of about 125,101 sq ft on Block 5601, Lot 2.06 in Piscataway Township.

Official description: Storage building, moderate hazard; reported construction cost $5,885,013

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2026-05-18 · #20261120 · Building permit (new construction) · 125,101 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records describe a new storage building of about 125,101 square feet on Block 5601, Lot 2.06 in Piscataway Township, Middlesex County. The county classifies it as a moderate-hazard storage building. That is a building-code category, and it usually means the stored goods burn more readily than ordinary materials. It is not a sign that anything dangerous is planned.

The records do not say what is on the site now, who will use the building, or who is building it. Searches turned up no news coverage, township agenda or minutes, or developer page that clearly refers to this lot. Other Piscataway warehouse projects appeared in the results, but none could be tied to this site, so none are described here.

What it could mean nearby

Where it stands

A county filing was recorded on 2026-05-18. No township approval or hearing could be confirmed online. In Piscataway, a project like this usually goes to the township Planning Board for site plan review, and then to construction permits if approved.

Want to weigh in? The Piscataway Township Planning Board most likely reviews site plans for this kind of project. Residents can usually comment at its public meetings, and the township planning department can confirm whether this lot is on an agenda.

Planning terms explained
Block and Lot
The numbers the township tax map uses to identify a specific parcel of land.
Site plan
A detailed drawing and review of how a property will be laid out, including the building, parking, drainage and driveways.
Moderate-hazard storage
A building-code category for storage of materials that burn at a moderate rate, which affects fire-protection requirements.
Bulk variance
Permission to depart from a zoning rule on size, height, setbacks or coverage.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $16.3M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →