PlannedNearby

Middlesex County · South Brunswick Township · #20250852

Assembly-use building, South Brunswick Township

South Brunswick Township, NJ · 15,635 sq ft non-residential, institutional

About this project

A new assembly-use building of about 15,635 sq ft, classed as lecture halls, art galleries or churches, is proposed on Block 86, Lot 89.0235 in South Brunswick Township, Middlesex County, NJ. The reported cost is about $1.65 million.

Official description: Lecture halls, Art Galleries, Churches, etc.; reported construction cost $1,653,500

Plan type
Building permit (new construction)
Land use
Lecture halls, Art Galleries, Churches, etc.
Status
Permit

Filing history

  • 2025-05-01 · #20250852 · Building permit (new construction) · 15,635 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A new assembly-use building of about 15,635 square feet is proposed on Block 86, Lot 89.0235 in South Brunswick Township. County records class it as the kind of building used for lecture halls, art galleries or places of worship. The reported cost is about $1.65 million.

County records don't say who will use the building or what is on the site now. The most recent county filing is dated May 2025. Searches turned up no news coverage, township agenda or minutes, developer page, or hearing notice that clearly refers to this lot. Nothing is known online about opposition, approvals or the intended occupant.

What it could mean nearby

Where it stands

The county shows a filing as of May 2025, and no approval or decision was found online. In New Jersey, a project like this usually goes to the township planning board or zoning board for site plan review and any needed variances. Construction permits follow once approvals are granted.

Want to weigh in? The township planning board or zoning board would likely decide, and residents can usually comment at its public hearing. Hearing notices are normally mailed to nearby owners and posted on the township website.

Planning terms explained
Assembly use
A building category for places where groups gather, such as houses of worship, lecture halls and galleries.
Block and lot
The tax-map numbers that identify a specific parcel of land in the township.
Site plan review
A local board's check of a project's layout, parking, drainage and access.
Variance
Permission to depart from a zoning rule, such as a size or setback limit.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $5.5M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →