PlannedNearby

Monmouth County · Manalapan Township · #20241375

Assembly-use building, Block 25, Lot 14

Manalapan Township, NJ · 36,311 sq ft non-residential, institutional

About this project

A new assembly-type building on Block 25, Lot 14 in Manalapan Township, Monmouth County, NJ, about 36,311 sq ft. The permit classification covers uses such as lecture halls, art galleries and churches.

Official description: Lecture halls, Art Galleries, Churches, etc.; reported construction cost $3,380,000

Plan type
Building permit (new construction)
Land use
Lecture halls, Art Galleries, Churches, etc.
Status
Permit

Filing history

  • 2024-06-13 · #20241375 · Building permit (new construction) · 36,311 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The county record describes a new assembly-type building of about 36,311 square feet on Block 25, Lot 14 in Manalapan Township. This permit category covers churches, lecture halls and similar gathering spaces.

Public planning board records point to a church proposal on Craig Road. They describe a two-story house of worship with a sanctuary of roughly 370 seats, classrooms, a social hall and offices. The planning board reportedly granted preliminary site plan approval in mid-2020. Later 2021 agendas list a follow-up application for final approval, and an amended version of the plan appears around late 2021. The search results link this to the lot, but the size in those sources was not checked against the county's 36,311 sq ft figure.

No source found confirms final approval, a building permit or construction. The county's June 2024 filing suggests the project is still moving toward construction.

What it could mean nearby

Where it stands

The project received preliminary site plan approval from the Manalapan Planning Board in 2020, and final approval was still under review in 2021 agendas. The outcome of final approval was not found. After final approval, the next steps are usually satisfying approval conditions, getting building permits and starting construction.

Want to weigh in? The Manalapan Township Planning Board decides site plan applications at public meetings, and residents can comment during the hearing on any application that returns to it.

Who's behind it

Evangelical Church of the Assemblies of God · A congregation that is the applicant for the Craig Road house of worship according to local news coverage; no other projects were found.

Around the web

Planning terms explained
Site plan
A detailed drawing showing the building, parking, driveways, drainage and landscaping on a lot.
Preliminary approval
An early approval that lets the applicant move forward once listed conditions are met.
Final approval
The last board approval of the plan, usually needed before building permits are issued.
Conditional use
A use the zoning allows in a zone only if it meets specific standards, such as a house of worship in a residential area.
Completeness review
A staff check that an application has all required documents before the board schedules a hearing.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $12.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →