PlannedNearby

Monmouth County · Tinton Falls Borough · #20250093

Factory building, Block 144 Lot 5.01

Tinton Falls Borough, NJ · 28,590 sq ft non-residential, industrial

About this project

A low-hazard factory and industrial building permit for about 28,590 sq ft of new construction on Block 144, Lot 5.01 in Tinton Falls Borough, Monmouth County, NJ.

Official description: Factory and industrial, low hazard; reported construction cost $250,000

Plan type
Building permit (new construction)
Land use
Factory and industrial, low hazard
Status
Permit

Filing history

  • 2025-02-03 · #20250093 · Building permit (new construction) · 28,590 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records show a permit filed for a new factory or industrial building of about 28,590 square feet on Block 144, Lot 5.01 in Tinton Falls Borough. The county classes it as low-hazard. That means the intended use is not expected to involve especially dangerous materials or processes.

The records do not say what is on the site now, who will occupy the building, or what it will make or store. No news coverage, borough meeting records, developer page or other online material was found that clearly refers to this lot. Nothing was found on opposition or on approvals.

What it could mean nearby

Where it stands

County records show a filing dated 2025-02-03 for a construction permit. Whether the borough's land-use board has approved the site plan is not known from public sources found. A project like this usually needs local site plan approval, then building permits and inspections before construction.

Planning terms explained
Block and Lot
The numbers the borough's tax map uses to identify a specific parcel of land.
Site plan approval
A local board's review of a project's layout, including the building, parking, drainage and access.
Low-hazard industrial use
A building-code category for industrial buildings that are not expected to involve especially dangerous materials or processes.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →