Monmouth County · Upper Freehold Township · #2026053

Storage building on Route 537

Route 537, Upper Freehold Township, NJ · 19,664 sq ft non-residential, warehouse & storage

About this project

A moderate-hazard storage building of about 19,664 square feet along Route 537 in Upper Freehold Township, with a reported construction cost of about $1.76 million.

Official description: Storage building, moderate hazard; reported construction cost $1,763,600

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2026-03-02 · #2026053 · Building permit (new construction) · 19,664 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A storage building of about 19,664 square feet is proposed along Route 537 in Upper Freehold Township, Monmouth County. County records classify it as warehouse and storage space with a moderate fire-hazard rating. The reported construction cost is about $1.76 million.

The county's latest filing on the project is dated March 2, 2026. The records do not say what is on the site now, who will use the building, or what kind of storage it will provide. No news coverage, township meeting records or developer page about this specific project was found.

The larger Upper Freehold warehouse disputes in the news are on other sites. This project is much smaller than those.

What it could mean nearby

Where it stands

The project appears in county planning records with a filing dated March 2, 2026. No township approval or hearing outcome was found. Usually the township planning board reviews the site plan in a public hearing, and county review of the Route 537 access runs alongside it.

Want to weigh in? The Upper Freehold Township Planning Board would normally hear the application at a public meeting, and the Monmouth County Planning Board reviews access to county roads like Route 537. Residents can check the township's meeting agendas for the hearing date.

Planning terms explained
Site plan
A detailed layout showing a building, parking, driveways, drainage and landscaping that a town reviews before construction.
Planning board
A local public body that holds hearings and decides whether development applications meet the town's rules.
Moderate hazard
A fire-code rating for buildings that store materials that burn at a moderate rate.
County road
A road run by the county, which reviews driveways and traffic changes on it.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.6M