PlannedNearby

Monmouth County · Wall Township · #20250100

Storage building, 1709 Hwy 34 Rear

1709 Hwy 34 Rear, Wall Township, NJ · 39,600 sq ft non-residential, warehouse & storage

About this project

A new low-hazard storage building of about 39,600 sq ft is proposed at the rear of 1709 Hwy 34 in Wall Township, Monmouth County.

Official description: Storage building, low hazard; reported construction cost $3,245,000

Plan type
Building permit (new construction)
Land use
Storage building, low hazard
Status
Permit

Filing history

  • 2025-01-27 · #20250100 · Building permit (new construction) · 39,600 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A new storage building of about 39,600 square feet is proposed at the rear of 1709 Highway 34 in Wall Township, Monmouth County. County records classify it as a low-hazard warehouse and storage use. That generally means it would hold ordinary goods and not dangerous materials.

The building would sit behind the existing frontage on Highway 34, a busy state road lined with commercial and industrial uses. The county record gives no tenant or end user, and it does not say what is on the rear land today.

No news coverage, township agenda or minutes, or developer page could be tied to this project. The details here come only from the county planning record, which was last updated on 2025-01-27.

What it could mean nearby

Where it stands

The county planning record was last updated on 2025-01-27. The township's own approval status could not be confirmed online. Projects like this usually need local site plan review and approval, then construction permits.

Want to weigh in? Site plans in Wall Township are typically reviewed at public meetings of the township planning board or zoning board, and residents can usually comment there. Check the township's website for agendas.

Planning terms explained
Site plan
A set of drawings showing where a building, parking, driveways and drainage would go on a property, reviewed by the town before approval.
Low-hazard storage
A building-code category for storing ordinary goods that don't pose a significant fire or explosion risk.
Planning board
A local public body that reviews development applications and holds public hearings.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $5.1M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →