Morris County · East Hanover Township · #26-0027

37 Eagle Rock Ave

37 Eagle Rock Ave, East Hanover Township, NJ · 9,096 sq ft non-residential, institutional

About this project

A new adult and child day care facility of about 9,096 square feet is planned at 37 Eagle Rock Ave in East Hanover Township, Morris County. It is designed for six or more occupants, with a reported construction cost of $2.2 million.

Official description: Institutional Adult/Child Day Care for 6+ Occupants; reported construction cost $2,235,000

Plan type
Building permit (new construction)
Land use
Institutional Adult/Child Day Care for 6+ Occupants
Status
Permit

Filing history

  • 2026-01-13 · #26-0027 · Building permit (new construction) · 9,096 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records show a plan for a new day care building at 37 Eagle Rock Ave in East Hanover Township. It would serve both adults and children. The building would be about 9,096 square feet, roughly the size of four or five average houses. The county lists a construction cost of about $2.2 million.

The building is designed for six or more occupants. That is a building-code category and does not limit how many people it can serve. Public parcel listings describe the site as holding an older house, built around 1930, though this was not confirmed against the plans.

No news coverage, township meeting agenda, developer page or opposition was found for this project. Who would run the facility is unknown. The explanation here rests on the county filing alone.

What it could mean nearby

Where it stands

The county filed its latest record on 2026-01-13. No approval or hearing result was found online. Projects like this usually need review by the township's land use board, then construction permits, and then building.

Want to weigh in? The East Hanover Township Land Use Planning Board usually hears site plan applications. Residents can attend its public meetings or check its posted agendas to comment.

Planning terms explained
Site plan
A detailed drawing showing where a building, parking, driveways and landscaping would go on a property.
Institutional use
A category for buildings that serve the public, such as schools, day care centers and health facilities.
Land use board
The local board that reviews development applications and decides whether they meet zoning and planning rules.
Variance
Permission to depart from a zoning rule, such as a size or setback limit.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.