PlannedNearby

Ocean County · Toms River Township · #25-03818

Storage building, Toms River Township

Toms River Township, NJ · 161,167 sq ft non-residential, warehouse & storage

About this project

A new moderate-hazard storage building of about 161,167 sq ft is proposed on Block 410.01, Lot 52 in Toms River Township.

Official description: Storage building, moderate hazard; reported construction cost $9,299,505

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2025-12-17 · #25-03818 · Building permit (new construction) · 161,167 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A new storage building of about 161,167 square feet is proposed in Toms River Township on Block 410.01, Lot 52. County records classify it as a moderate-hazard storage use. That means it is a warehouse-type building and not a home, shop or office. For comparison, that is roughly the size of three football fields of floor space.

The county filing does not say what the lot looks like today or who would use the building. No developer, tenant, street address or local hearing was found online that clearly matches this site. Other storage projects in Toms River turned up in searches, but none could be tied to this lot, so they are not used here.

What it could mean nearby

Where it stands

The county logged a filing on 2025-12-17, which suggests the project is in review. The township planning board or zoning board, plus the county and state agencies that review site plans, usually has to approve it before construction permits are issued. No local hearing date or decision was found.

Want to weigh in? The Toms River Township land use board that hears the application decides locally. Residents can usually comment at its public meeting, and the hearing notice is normally mailed to nearby owners. Check the township's board agendas for this block and lot.

Planning terms explained
Block and Lot
The numbers the township tax map uses to identify a specific parcel of land.
Site plan approval
A board's approval of a building's layout, including parking, drainage, lighting and access.
Variance
Permission to depart from a zoning rule, such as a limit on building size or coverage.
Moderate-hazard storage
A building-code category for storing materials that carry a moderate fire risk.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $21.0M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →