Ocean County · Jackson Township · #202501759
Business-use building, Block 7309, Lot 12.01
Jackson Township, NJ · 13,208 sq ft non-residential, office
About this project
Permit for a new business-use building on Block 7309, Lot 12.01 in Jackson Township, about 13,208 sq ft, with reported construction cost of $2.5 million.
Official description: Business Uses; reported construction cost $2,500,000
- Plan type
- Building permit (new construction)
- Land use
- Business Uses
- Status
- Permit
Filing history
- 2025-08-19 · #202501759 · Building permit (new construction) · 13,208 sq ft
The full picture AI research · Nov 1, 2026
A permit has been filed for a new business-use building on Block 7309, Lot 12.01 in Jackson Township, Ocean County. The building would be an office of about 13,208 square feet. The county record lists a reported construction cost of $2.5 million.
The records don't say what is on the site now or who will occupy the building. Online searches found no news coverage, township agenda items, hearing notices or developer project page tied to this lot. Nothing was found about opposition or approvals beyond the county filing.
What it could mean nearby
- Traffic: a 13,208 sq ft office would bring daily employee and visitor trips, but no traffic study was found.
- Jobs: office space usually supports local jobs, but the number and type depend on the future tenants, who are not known.
- Schools and open space: no effect is indicated by the available records.
Where it stands
A county filing dated 2025-08-19 shows the project at the permit stage. The usual next steps are township review and approvals if still needed, then construction permits, inspections and a certificate of occupancy.
- Aug 19, 2025 Latest county filing for the new business-use building permit
Want to weigh in? Residents can ask the Jackson Township planning or zoning board office whether this lot has an application or hearing scheduled. Public comment is normally taken at board meetings.
Planning terms explained
- Block and Lot
- The numbers the township and county use to identify a specific parcel of land on the tax map.
- Non-residential square footage
- The total floor area of a building that is not used for housing, such as offices.
- Certificate of occupancy
- The final municipal approval that says a finished building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.0M
- ~44 roofing squares (assumes 3 stories)
- ~33 tons of cooling (rule of thumb 400 sq ft/ton)