PlannedNearby

Salem County · Pilesgrove Township · #202400175+ZP

Storage building, Pilesgrove Township

Pilesgrove Township, NJ · 46,700 sq ft non-residential, warehouse & storage

About this project

A new storage building of about 46,700 sq ft is proposed on Block 45, Lot 1.05 in Pilesgrove Township, Salem County, NJ.

Official description: Storage building, moderate hazard; Other Non-Residential; reported construction cost $15,960,000

Plan type
Building permit (new construction)
Land use
Other Non-Residential
Status
Permit

Filing history

  • 2026-03-23 · #202400175+ZP · Building permit (new construction) · 46,700 sq ft
  • 2025-05-07 · #202500073+A · Building permit (new construction) · 5,327 sq ft
  • 2025-04-09 · #202500049 · Building permit (new construction) · 19,581 sq ft
  • 2025-04-09 · #202500050 · Building permit (new construction) · 1,899 sq ft
  • 2024-10-21 · #202400175 · Building permit (new construction) · 730,564 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records show a new storage building of about 46,700 square feet proposed on Block 45, Lot 1.05 in Pilesgrove Township, Salem County. That is roughly the footprint of a large warehouse. The records don't say what will be stored or who will use it.

The township planning board's records list the same lot under Pointers Auburn 1, LLC. The board approved an amended site plan for that lot in 2026, and the approval came with conditions. The lot already has industrial buildings and has been through earlier site plan and variance reviews. The township's posted records don't state that the 2026 approval is for this storage building, so that link is likely but not confirmed. No news coverage or organized opposition was found.

What it could mean nearby

Where it stands

The planning board granted amended general development plan approval and amended preliminary and final major site plan approval for the lot on June 17, 2026. It put that decision into a formal resolution on July 15, 2026. Next steps are usually meeting the approval conditions, getting construction permits and then building. These steps are inferred from how approvals normally work, not from records for this project.

Want to weigh in? The Pilesgrove Township Planning Board decided this application, so any further changes would likely come back to it. Residents can comment at its public meetings, which are listed on the township website.

Who's behind it

Pointers Auburn 1, LLC · The township planning board lists this company as the applicant and owner on Block 45, Lot 1.05; no company website or other details were found.

Planning terms explained
Site plan
A detailed layout showing buildings, parking, driveways and drainage that a town reviews before construction.
General development plan
An overall plan for a large site that sets the general mix of uses and layout, with details approved later.
Preliminary and final major site plan approval
The board's two-stage approval for a larger project, granted here together.
Bulk variance
Permission to depart from a zoning limit on size or height, such as the height of a tank.
Resolution
The board's written decision that formally records a vote taken earlier.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $6.1M