Salem County · Carneys Point Township · #20240067
Storage building, Carneys Point Township
Carneys Point Township, NJ · 596,443 sq ft non-residential, warehouse & storage
About this project
A new low-hazard storage building of about 596,443 sq ft is proposed on Block 255, Lot 5.03 in Carneys Point Township, NJ.
Official description: Storage building, low hazard; reported construction cost $48,514,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, low hazard
- Status
- Permit
Filing history
- 2024-03-04 · #20240067 · Building permit (new construction) · 596,443 sq ft
The full picture AI research · Nov 1, 2026
The county record describes a new low-hazard storage building of about 596,443 square feet on Block 255, Lot 5.03 in Carneys Point Township. That is roughly the footprint of more than ten football fields. Published coverage of the Rockefeller Group Logistics Center at Carneys Point reports a building of exactly this size. The match rests on that size, because no source cites the block and lot number.
The logistics center has two warehouses, of 596,443 and 530,000 square feet, on a 141-acre site near Forest Lane and Route 40. Trade press reported a groundbreaking in May 2024. The buildings have 40-foot interior heights and parking for cars and trailers. Delivery was slated for early 2025. A leasing listing shows the larger building as divisible and available in 2026. No tenant for it was found.
What it could mean nearby
- Truck and trailer traffic would use Route 40 and Forest Lane. The site is about 2.7 miles from I-295 Exit 4, according to trade coverage.
- The site has parking for 658 cars and 328 trailers, which points to steady daily vehicle activity.
- The developer and press have not published reliable job counts for this building, so employment effects are unconfirmed.
Where it stands
Trade press reported construction under way in 2024, so approvals appear to have been granted. No township approval document for this lot was found. The building was being marketed for lease in 2026, and the next steps are finishing construction and signing a tenant.
- May 2024 Groundbreaking reported on the two-building logistics center, including the 596,443 sq ft building
- Mar 4, 2024 Latest county planning filing for the storage building
Want to weigh in? The project appears to have local approval already. Future questions can go to the Carneys Point Township planning board or the township committee, whose public meetings are listed on the township website.
Who's behind it
Rockefeller Group · A New York City-based real estate developer that builds industrial and logistics centers, among other property types.
Around the web
- Rockefeller Group Breaks Ground on 1.1 MSF Industrial Project in Carneys Point, New JerseyREBusinessOnline · May 23, 2024Reports the two buildings (596,443 and 530,000 sq ft), the 141-acre site, features, financing and early 2025 delivery.
- Rockefeller Group Logistics Center at Carneys Point - Building BCBRELists the 596,443 sq ft building as available for lease and divisible.
Planning terms explained
- Block and Lot
- The numbers the township tax map uses to identify a specific parcel of land.
- Low-hazard storage
- A building use category for storing goods that carry little fire or explosion risk.
- Clear height
- The usable vertical space inside a warehouse, from the floor to the lowest overhead structure.
- Speculative building
- A building constructed before a tenant has signed a lease.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $77.5M
- ~5,964 roofing squares (assumes 1 story)
- ~1,491 tons of cooling (rule of thumb 400 sq ft/ton)