Somerset County · Franklin Twp Township · #26-00079

201,610 sq ft storage building, Franklin Twp

Franklin Twp Township, NJ · 201,610 sq ft non-residential, warehouse & storage

About this project

A moderate-hazard storage building of about 201,610 sq ft in Franklin Township, with a reported construction cost of $7.85 million.

Official description: Storage building, moderate hazard; reported construction cost $7,850,000

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2026-01-12 · #26-00079 · Building permit (new construction) · 201,610 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A warehouse of about 201,610 square feet, roughly 45 feet tall, is proposed at 195-215 Davidson Avenue in the Somerset section of Franklin Township. County records list a reported construction cost of $7.85 million and classify it as a moderate-hazard storage building.

A 2022 traffic study says the existing buildings on the site, which include a hotel and light industrial space, would be torn down and replaced. The site is about 12.7 acres, according to a property listing. The developer applied to the township planning board for site plan approval, a conditional use approval and zoning variances. A broker listing now markets the building for lease, with 32 loading docks, and says development is starting soon. No tenant was named. No vote or approval resolution for this project was found online.

What it could mean nearby

Where it stands

A township planning board application was on the agenda in 2023, and county records show a filing as recent as January 2026. A broker is now marketing the space. Once approvals are in place, the developer typically applies for building permits and then starts construction.

Want to weigh in? The Franklin Township Planning Board reviews the application at public meetings, where residents can usually comment.

Around the web

Planning terms explained
Major site plan
A detailed layout showing the building, parking, drainage and access that the board must approve.
Conditional use
A use the zone allows only if it meets extra standards set by the township.
C variance
Permission to depart from a specific zoning rule, such as a height or setback limit.
B-I zone
A business-industrial zoning district in the township.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $26.2M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →