Sussex County · Andover Township · #25-34195
Storage building, Andover Township
Andover Township, NJ · 14,040 sq ft non-residential, warehouse & storage
About this project
A building permit for a 14,040 sq ft moderate-hazard storage building in Andover Township, Sussex County, with a reported construction cost of $600,000.
Official description: Storage building, moderate hazard; reported construction cost $600,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2025-06-02 · #25-34195 · Building permit (new construction) · 14,040 sq ft
- 2025-06-02 · #25-34194 · Building permit (new construction) · 2,527 sq ft
The full picture AI research · Nov 1, 2026
A building permit was filed with the county for a new storage building in Andover Township, Sussex County. The building would cover about 14,040 square feet, roughly the footprint of five or six average houses. The county classifies it as a moderate-hazard storage building, meaning it would hold ordinary goods that burn at a moderate rate. The reported construction cost is $600,000.
The county record doesn't give the street address, the owner or who would use the building. No news coverage, township meeting item, or developer page could be tied to this project. Nothing is known online about opposition, approvals, or the site's current condition.
What it could mean nearby
- Truck and delivery traffic could change on nearby roads, but the records give no detail on this.
- A storage building usually creates few permanent jobs, though construction would bring temporary work.
- Site details such as drainage, lighting and screening are unknown without township application files.
Where it stands
A building permit filing was recorded on 2025-06-02. Building permits usually follow any needed local land-use approvals. Next come inspections during construction and then a certificate of occupancy.
- Jun 2, 2025 Latest county filing for the building permit
Want to weigh in? Andover Township's Land Use Board handles site plans and holds public meetings. Residents can check its agendas on the township website or ask the township clerk whether this project had a hearing.
Planning terms explained
- Building permit
- Official approval from the local construction office to build, based on code and safety review.
- Moderate-hazard storage
- A fire-code category for storing goods that burn at a moderate rate, which affects building safety requirements.
- Site plan
- A drawing showing how a lot will be laid out, including buildings, parking, drainage and landscaping.
- Certificate of occupancy
- A final approval that says a completed building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $1.8M
- ~140 roofing squares (assumes 1 story)
- ~35 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →