Union County · Springfield Township · #25-0869
89-95 Victory Rd
89-95 Victory Rd, Springfield Township, NJ · 152,141 sq ft non-residential, warehouse & storage
About this project
A new low-hazard storage building of about 152,141 sq ft is proposed at 89-95 Victory Rd in Springfield Township, Union County.
Official description: Storage building, low hazard; reported construction cost $12,099,768
- Plan type
- Building permit (new construction)
- Land use
- Storage building, low hazard
- Status
- Permit
Filing history
- 2026-01-22 · #25-0869 · Building permit (new construction) · 152,141 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 152,141 square feet is proposed at 89-95 Victory Rd in Springfield Township, Union County. County records describe it as a low-hazard storage use. That generally means the building would hold goods that carry little fire or explosion risk, rather than hazardous materials.
The records do not say what is on the site now, who would use the building, or whether it would be warehouse space or self-storage. A web search found no news, township agenda, hearing notice or developer page clearly about this address. Some results mentioned other Victory Road projects, including one in Howell and a self-storage proposal at a different Springfield address. They were not matched to this site and are not used here.
What it could mean nearby
- The records give no traffic or truck-count figures. A building this size could bring more truck and delivery traffic to Victory Rd.
- Job numbers and tenant details are not in the records.
- Effects on utilities, stormwater and schools cannot be judged from the available information.
Where it stands
A filing was made with the county on 2026-01-22. No township approval or denial was found online. Next, the local planning or zoning board would normally review the plans at a public hearing and then vote.
- Jan 22, 2026 Latest filing for the project in county planning records
Want to weigh in? The Springfield Township land-use board that reviews the application would decide next. Residents can usually comment at its public hearing, and the township clerk can confirm the meeting date.
Planning terms explained
- Site plan
- A detailed layout showing a building's location, parking, driveways, drainage and landscaping, which a board reviews before approving construction.
- Variance
- Permission to depart from a zoning rule, such as building size or height, granted by the local board after a hearing.
- Low-hazard storage
- A building-code category for storing materials that pose little risk of fire or explosion.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $19.8M
- ~1,521 roofing squares (assumes 1 story)
- ~380 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →