# 165.69-ac solar subdivision/land dev., Jackson Twp

Jackson Township, PA · subdivision (use not stated) · 165.7 acres

In short: **165.69-ac solar subdivision/land dev., Jackson Twp** is a subdivision in Jackson Township, Northumberland County, PA. The site is 165.7 acres. As of November 24, 2026, the public records we track show nothing newer since August 19, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Aug 19, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Preliminary/final minor subdivision and land development plan for a 165.69-acre site in Jackson Township, submitted by Northumberland Solar 1, LLC. The agenda does not describe the layout or current use.

- **Applicant:** [Northumberland Solar 1, LLC](https://plannednearby.com/f/northumberland-solar-1-llc)
- **Engineer / designer:** [New Leaf Energy, Inc.](https://plannednearby.com/f/new-leaf-energy-inc)
- **Plan type:** Preliminary/final minor subdivision and land development
- **Land use:** other

## Project history

- **2024-08-19** · #1024-097 · Preliminary/final minor subdivision and land development

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

Northumberland Solar 1, LLC filed a plan with Northumberland County for a 165.69-acre site in Jackson Township. The filing is a combined preliminary and final "minor subdivision and land development" plan. The name and the firms on the filing, which include New Leaf Energy, Inc., point to a solar project.

The county agenda doesn't describe the layout, the project's electric output or what the land is used for now. The web searches found no project page, news story, township hearing notice or construction report that is clearly about this site. Several larger solar plants in Northumberland County turned up, including an operating 65 MW plant near Milton. Nothing links them to this filing, so they are not treated as the same project.

### What it could mean nearby

- Nothing found on traffic, jobs, schools or utilities for this site. Solar projects usually bring construction traffic for a limited time and few permanent jobs.
- The county records don't say what the land is used for now, so effects on open space or farmland can't be judged.

### Where it stands

The county received the combined preliminary/final plan on 2024-08-19, and no later records were found. Township and county review normally comes first. Stormwater and other state permits and the start of construction usually follow approval.

- **Aug 19, 2024** Preliminary/final minor subdivision and land development plan filed for county review

### Who's behind it

Northumberland Solar 1, LLC (with New Leaf Energy, Inc.) · New Leaf Energy is a solar developer whose publicly reported work includes community solar portfolios in states such as Virginia and Illinois.

### Around the web

- [Northumberland County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County, PA · Aug 19, 2024The county page that lists the 2024-08-19 filing. Its agenda posts, as read, did not mention the project, so the PDFs behind them were not checked.

Planning terms explained

- **Land development:** Building or improving a site in a way that needs formal township review, such as a solar array with its access and drainage features.
- **Minor subdivision:** A small division of land into a few parcels, which gets a simpler review than a large subdivision.
- **Preliminary/final plan:** A single submission that asks for both the early and the last plan approval at the same time.
- **Stormwater permit:** A state-reviewed permit that controls runoff and erosion from construction on larger sites.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Plans like this normally go to the Jackson Township supervisors and planning commission, and the county planning commission also reviews them. Residents can ask the township office about meeting dates and public comment.

In Pennsylvania, Jackson Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Jackson Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Jackson Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Jackson Township's meeting agendas →](https://www.google.com/search?q=Jackson+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [165.7-acre solar land development, Jackson Twp](https://plannednearby.com/x/northumberland-824-077) — same area · subdivision (use not stated) · Jackson Township · filed 2024-08-19
- [7.16-acre add-on subdivision, Jackson Twp](https://plannednearby.com/x/northumberland-525-059) — same area · lot line change · Jackson Township · filed 2025-06-11
- [Final minor subdivision, Jackson Township](https://plannednearby.com/x/northumberland-final-minor-subdivision-jackson-township-5d9fcb) — same area · lot line change · Jackson Township · filed 2026-07-21
- [2.312-acre minor/add-on subdivision, Jackson Twp](https://plannednearby.com/x/northumberland-1024-098) — same area · subdivision (use not stated) · Jackson Township · filed 2024-09-25
- [St. Louis DeMontfort Academy add-on, Jackson Twp](https://plannednearby.com/x/northumberland-525-047) — same area · institutional · Jackson Township · filed 2025-05-05
- [Final land development, Jackson Township](https://plannednearby.com/x/northumberland-final-land-development-jackson-township-15252c) — same area · other · Jackson Township · filed 2025-11-19

[See everything nearby on a map →](https://plannednearby.com/near#40.71767,-76.83424,Jackson%20Township)

---

Source page: https://plannednearby.com/x/northumberland-1024-097

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.