[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Rockefeller/Zerbe Township](https://plannednearby.com/c/northumberland-pa/rockefeller-zerbe-township) · #1124-102

# Final minor subdivision, Rockefeller/Zerbe Twp

Rockefeller/Zerbe Township, PA · lot line change · 19.3 acres

In short: **Final minor subdivision, Rockefeller/Zerbe Twp** is a lot line change in Rockefeller/Zerbe Township, Northumberland County, PA. The site is 19.3 acres. As of November 24, 2026, it is in review. Latest record: Official record (northumberlandcountypa.gov): Still in county review; most recent filing (Final Add-on Subdivision) submitted 11-13-25 for the 11-25-25 meeting (November 13, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Official record (northumberlandcountypa.gov): Still in county review; most recent filing (Final Add-on Subdivision) submitted 11-13-25 for the 11-25-25 meeting · Nov 13, 2025 · [source](https://northumberlandcountypa.gov/htdocs/wp-content/uploads/documents/planning/2025_11_25_planning_minutes.pdf)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A final minor subdivision of a 19.34-acre property in Rockefeller/Zerbe Township, submitted by Bowen Development LLC. The agenda does not describe what is proposed or what is on the land now.

- **Applicant:** [Bowen Development LLC](https://plannednearby.com/f/bowen-development-llc)
- **Engineer / designer:** [Zeigler Surveying LLC](https://plannednearby.com/f/zeigler-surveying-llc)
- **Plan type:** Final minor subdivision
- **Land use:** lot-line-change

## Project history

- **2024-11-07** · #1124-102 · Final minor subdivision

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 17, 2026

A 19.34-acre property in Rockefeller (Zerbe) Township is being divided under a final minor subdivision filed by Bowen Development LLC, with Zeigler Surveying LLC as the surveyor. The first county filing was in November 2024. The county agenda didn't say what is proposed or what is on the land now.

The case later returned to the county planning commission. A fact-check summary of the county's Oct and Nov 2025 minutes lists a Final Major Subdivision filing on 2025-10-23 and a Final Add-on Subdivision filing on 2025-11-13. The minutes PDFs could not be text-read in this research, so those entries were not independently confirmed. A Rockefeller Township agenda for 11/11/25 lists a subdivision plan approval on Route 890 under the name "Bowen Agency". It is not confirmed that this is the same project.

No developer page, listings, news coverage or construction reports were found. Nothing found shows homes, lots or a business at the site yet.

### What it could mean nearby

- The records don't say how many lots or homes are planned, so traffic, school or utility effects can't be estimated.
- The township agenda places the item on Route 890, a state road, so any new driveways would likely need access review.

### Where it stands

The plan appears to still be in county and township review. The most recent filing reported is dated Nov 2025, and no approval or decision was found. A final plan is usually approved, then recorded, before lots can be sold or built on. Note: The page's 'lot line change' label and 'no recent records' claim conflict with reported later county filings (a Final Major Subdivision and a Final Add-on Subdivision in Oct and Nov 2025). The county minutes could not be text-read, so this rests on the fact-check summary plus the township agenda.

- **Nov 25, 2025** County planning meeting for which a Final Add-on Subdivision filing was reported submitted (2025-11-13)
- **Nov 11, 2025** Rockefeller Township agenda lists 'Bowen Agency Plan Approval - Subdivision on Route 890'
- **Oct 23, 2025** Final Major Subdivision filing reported submitted to the county
- **Jul 2025** Final Minor Subdivision appears on a county agenda, reported as a missed filing
- **Nov 7, 2024** Final minor subdivision filed for county review

### Who's behind it

Bowen Development LLC · No company website or other projects were found.

### Around the web

- [Rockefeller Township, November 2025](https://rockefellertownship.org/2025/11/) — Rockefeller Township · Nov 7, 2025The 11/11/25 agenda lists a Bowen Agency plan approval for a subdivision on Route 890.
- [Northumberland County Planning Commission minutes, Nov 2025](https://northumberlandcountypa.gov/htdocs/wp-content/uploads/documents/planning/2025_11_25_planning_minutes.pdf) — Northumberland County · Dec 15, 2025Cited by the fact-check for the Nov 2025 Final Add-on filing; the PDF text could not be read here.
- [Northumberland County Planning Commission minutes, Oct 2025](https://northumberlandcountypa.gov/htdocs/wp-content/uploads/documents/planning/2025_10_28_planning_minutes.pdf) — Northumberland County · Nov 21, 2025Cited by the fact-check for the Oct 2025 Final Major filing; the PDF text could not be read here.
- [County planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County · Nov 7, 2024Shows the original Nov 2024 final minor subdivision filing.

Planning terms explained

- **Final minor subdivision:** A simplified final approval for dividing land into a small number of lots.
- **Final major subdivision:** A fuller approval process for larger divisions, usually with new lots, roads or utilities.
- **Add-on subdivision:** A change that adds land to an existing lot or plan.
- **Lot line change:** Moving a boundary between properties without creating new lots.

Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Northumberland County Planning Commission reviews the subdivision, and the Rockefeller Township supervisors and planning commission take up local plan approval at their public meetings, where residents can comment.

In Pennsylvania, Rockefeller/Zerbe Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Rockefeller/Zerbe Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Rockefeller/Zerbe Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Rockefeller/Zerbe Township's meeting agendas →](https://www.google.com/search?q=Rockefeller%2FZerbe+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

---

Source page: https://plannednearby.com/x/northumberland-1124-102

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
