[Northumberland County](https://plannednearby.com/c/northumberland-pa/) · [Zerbe/Little Mahanoy Township](https://plannednearby.com/c/northumberland-pa/zerbe-little-mahanoy-township) · #1124-109

# Final minor subdivision, Sunshine Rd., Zerbe/Little Mahanoy

Sunshine Rd., Zerbe/Little Mahanoy Township, PA · lot line change · 238.2 acres

In short: **Final minor subdivision, Sunshine Rd., Zerbe/Little Mahanoy** is a lot line change in Zerbe/Little Mahanoy Township, Northumberland County, PA. The site is 238.2 acres. As of November 24, 2026, the public records we track show nothing newer since November 13, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Nov 13, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

A final minor subdivision of two parcels on Sunshine Rd. in Zerbe/Little Mahanoy Township, totaling about 238.2 acres (119.25 and 118.96 acres). The agenda does not describe what is proposed or what is on the land now.

- **Applicant:** [Sunshine Rd. LLC & Big Mt. Sunshine LLC](https://plannednearby.com/f/sunshine-rd-llc-big-mt-sunshine-llc)
- **Engineer / designer:** [Zeigler Surveying LLC](https://plannednearby.com/f/zeigler-surveying-llc)
- **Plan type:** Final minor subdivision
- **Land use:** lot-line-change

## Project history

- **2024-11-13** · #1124-109 · Final minor subdivision

[County plan review office →](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3)

Map pin is approximate.

## The full picture AI research · Nov 13, 2026

County planning records show a final minor subdivision of two parcels on Sunshine Rd. in Zerbe Township and Little Mahanoy Township, Northumberland County. Together the parcels cover about 238.2 acres (roughly 119.25 and 118.96 acres). The owners on the filing are Sunshine Rd. LLC and Big Mt. Sunshine LLC. Zeigler Surveying LLC prepared the plan.

The filing is classed as a lot line change. That usually means property boundaries are being redrawn between existing parcels, not that a development is being built. The county agenda does not say what is proposed on the land or what is there now.

Searches found no developer website, news story, township minutes, listings, permits or business at this site. Nothing found online shows homes, a building or an operating business planned or under way.

### What it could mean nearby

- The records describe a boundary change only. They show no new homes, buildings, roads or jobs, so no traffic or school effects can be tied to this filing.
- Any later building plan on these roughly 238 acres would need its own township review, and that is when effects on traffic and utilities would be studied.

### Where it stands

The final minor subdivision was filed for county review on 2024-11-13, and no later decision, permit or construction was found. A county review comment usually goes to the township, which then acts on the plan. The deed is then recorded for the new lot lines.

- **Nov 13, 2024** Final minor subdivision filed for county review

### Who's behind it

Sunshine Rd. LLC and Big Mt. Sunshine LLC · These are the two landowner companies named on the county filing. No company website or other projects were found.

### Around the web

- [Planning commission agenda feed](https://northumberlandcountypa.gov/feed/?s=planning+commission+agenda&paged=3) — Northumberland County, PA · Nov 13, 2024This is the county feed that lists the filing. It shows no property detail beyond the agenda posting.

Planning terms explained

- **Final minor subdivision:** The last formal review step for a small division of land, usually into only a few lots and with no new streets.
- **Lot line change:** An adjustment of the boundary between existing parcels that does not by itself create new building lots.
- **County planning commission review:** A county-level look at a local land plan that results in advisory comments to the township, which makes the decision.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 13, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The township supervisors or planning body for Zerbe Township and Little Mahanoy Township decide on a subdivision plan, and residents can contact those municipal offices or attend their public meetings. The county planning commission only reviews it.

In Pennsylvania, Zerbe/Little Mahanoy Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Zerbe/Little Mahanoy Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Zerbe/Little Mahanoy Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Zerbe/Little Mahanoy Township's meeting agendas →](https://www.google.com/search?q=Zerbe%2FLittle+Mahanoy+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

---

Source page: https://plannednearby.com/x/northumberland-1124-109

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
