PlannedNearby

Northumberland County · Turbotville Borough · #1225-125

Land development, Turbotville Borough (4.8 ac)

Turbotville Borough, PA · other · 4.8 acres

In short: Land development, Turbotville Borough (4.8 ac) is a development project in Turbotville Borough, Northumberland County, PA. The site is 4.8 acres. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development filed for county review (June 4, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Preliminary/final land development filed for county review · Jun 4, 2025 · source
  1. Proposed
  2. In reviewJun 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

A preliminary/final land development in Turbotville Borough covering about 4.8 acres, submitted by Turbotville MCS Associates. The agenda does not describe the proposed use or what exists on the site.

Applicant
Turbotville MCS Associates
Engineer / designer
Axtman Engineering
Plan type
Preliminary/final land development
Land use
other

Project history

  • 2025-06-04 · #1225-125 · Preliminary/final land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 8, 2026

A company called Turbotville MCS Associates has asked for review of a preliminary/final land development in Turbotville Borough, Northumberland County. The site is about 4.8 acres. County planning records don't say what will be built or what is on the land now.

A "preliminary/final" plan combines two review steps into one. That usually means the plan is fairly detailed. Axtman Engineering is listed as the firm on the filing.

Searches found no developer website, news coverage, borough meeting minutes, listings, business openings or permit records for this project. Nothing shows opposition, an approval, a tenant or construction. What is happening on the site today is unknown.

What it could mean nearby

Where it stands

The county planning agenda for January 2026 lists the plan as a preliminary/final land development under review, with a county filing date of 2025-06-04. No later decision was found. Borough and county reviews usually end in an approval, a conditional approval or a request for changes, and construction permits follow after that.

Who's behind it

Turbotville MCS Associates

Around the web

Planning terms explained
Preliminary/final land development
A combined review that covers both the early and the final plan stages for a project in a single submission.
Land development
A formal plan to build or change the use of a site, which is reviewed for things like stormwater, access and utilities.
Consultant
The engineering or design firm that prepared the plan for the applicant.

Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Turbotville Borough, which approves land development plans, and the Northumberland County Planning Commission, which reviews them, are the public bodies involved. Residents can ask the borough office about meeting dates and comment times.

In Pennsylvania, Turbotville Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Turbotville Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.