Northumberland County · Milton Borough · #125-003
Add-on subdivision, Milton Borough
Milton Borough, PA · lot line change · 0.4 acres
In short: Add-on subdivision, Milton Borough is a lot line change in Milton Borough, Northumberland County, PA. The site is 0.4 acres. As of November 24, 2026, it is in review. Latest record: Final add-on subdivision filed for county review (December 30, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Final add-on subdivision in Milton Borough on about 0.430 acres. The agenda does not describe the existing use or the lots created.
- Engineer / designer
- Mid-Penn Engineering Corp.
- Plan type
- Final add-on subdivision
- Land use
- lot-line-change
Project history
- 2024-12-30 · #125-003 · Final add-on subdivision
Map pin is approximate.
The full picture AI research · Nov 14, 2026
This is a small boundary adjustment in Milton Borough, not a new building project. A final "add-on" plan on about 0.43 acres moves a strip of land from one lot to the neighboring lot. No new lots or homes are created.
The county agenda doesn't say where the land is. Milton Planning Commission minutes from January 2025 describe a likely match: a lot add-on plan at 327 High Street, presented by Mid-Penn Engineering. In that plan, an owner would give part of a lot to the adjoining property so the neighboring house has room for a future addition. The minutes don't give an acreage, so the match is probable but not confirmed.
No construction, developer website or news coverage was found. The 327 High Street listings found online show an existing house sold in late 2025. That is ordinary resale activity and doesn't show whether the lot change was finished.
What it could mean nearby
- No new homes, traffic or utility demand is expected, because a lot line change only moves a boundary.
- The neighboring house could gain yard or room for a future addition, according to the January 2025 minutes.
Where it stands
The county shows the final add-on plan filed for review on 2024-12-30. The Milton Planning Commission recommended approval on 2025-01-14 for what is probably this plan, and Borough Council normally decides next. The Council's decision could not be confirmed from the sources that were readable.
- Dec 2025 A listing site shows the house at 327 High Street, Milton sold; the listing sites disagree on dates, and this may be unrelated to the lot change
- Feb 12, 2025 Borough Council meeting minutes exist for this date, but the file could not be read, so any decision on this plan is unconfirmed
- Jan 14, 2025 Milton Planning Commission recommended that Borough Council approve a lot add-on plan at 327 High Street (probable match)
- Dec 30, 2024 Final add-on subdivision filed for county review
Who's behind it
Mid-Penn Engineering Corp. · An engineering firm that prepared and presented the plan for the owner; it is not a developer or builder.
Around the web
- Minutes of the Milton Planning Commission meeting, revised 01/16/25Milton Borough · Jan 14, 2025Records a recommendation of approval for a lot add-on plan at 327 High Street presented by Mid-Penn Engineering.
- February 12 2025 MinutesMilton Borough · Feb 12, 2025Borough Council minutes for the meeting after the Planning Commission review; the text could not be read, so no decision is cited.
- 327 High St, Milton, PA 17847TruliaShows an existing 1952 house at this address with a sale record in December 2025, and no new construction.
Planning terms explained
- Add-on subdivision
- Land is taken from one lot and joined to a neighboring lot, so no new building lot is created.
- Lot line change
- A change to the boundary between two existing properties.
- Final plan
- The last detailed plan reviewed before the municipality approves it and it is recorded.
- Planning Commission
- A volunteer board that reviews plans and advises the elected council.
Researched by AI from public sources on Nov 14, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Milton Borough Council makes the local decision after the Planning Commission, and comments can be given at its public meetings, with dates and agendas on the borough website.
In Pennsylvania, Milton Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Milton Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Milton Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Milton Borough's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Lot consolidation in Milton Boroughsame area · lot line change · Milton Borough · filed 2025-11-12
- Add-on subdivision, Turbot Townshipsame area · lot line change · Turbot Township · filed 2026-07-24
- Minor subdivision, Turbot Townshipsame area · subdivision (use not stated) · Turbot Township · filed 2025-05-13
- Final minor/add-on subdivision, Turbot Townshipsame area · lot line change · Turbot Township · filed 2026-04-28
- 4.8-acre final minor subdivision, W. Chillisquaquesame area · subdivision (use not stated) · West Chillisquaque Township · filed 2026-10-22
- Final land development, 32.66 ac, Turbot Townshipsame area · other · Turbot Township · filed 2024-03-19